Published April 28, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a civil project in West Valley City, Utah. Completed plans call for the construction of a water / sewer project; and water / sewer project.

Question Deadline 04/07/2026 at 5:00 PM MT Question deadline changed from 03/31/2026 at 12:30 PM As per Website The location of the work is as indicated on the Contract Drawings. 1. The project will be constructed at 1002 West 2320 South, West Valley City. C. The work to be performed consists of furnishing and installing the facilities and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: 1. Obtaining all permits. 2. Adhere to Bureau of Reclamation (BOR) funding requirements including: Buy America and Davis-Bacon Wage Act Compliance, and all requirements as shown in the Project Documents. 3. Project supervision. 4. Mobilization/Demobilization. 5. Construction of a masonry block well house building with standing seam metal roofing, HVAC system; site work including: grading, concrete sidewalk, curb and gutter, and asphalt pavement. 6. Equipping of the well house with a vertical turbine pump and motor, piping valves, flow meter, miscellaneous fittings and appurtenances, and chlorine generation system. 7. Electrical connections to and electrical work associated with the well house and installation of a new emergency generator, and telemetry wiring for RTU. 8. Installation of an 18" PVC discharge line, 12" pump-to-waste line, and 18" and 15" storm drain piping. 9. Construction of a surgetank vault and piping, pump-to-waste connection vault, and existing outfall modifications (to be included as an additive alternate). 10. Construction of a new cul-de-sac on 2320 South. Questions Due Date: Mar 17th 2026, 3:00 PM MDT All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER no later than seven (7) calendar days prior to opening of Bids. In the ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents. Intent to Bid Due Date: Mar 25th 2026, 3:00 PM MDT

Award

Water / Sewer

$5,969,424.00

Public - City

New Construction, Site Work

102

33

28

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
88
Bidding Soon
1,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

May 11, 2026

Project location map

1002 2320 S, West Valley City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.