BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated February 7, 2026

Remodeling of an educational facility in Three Oaks, Michigan. Completed plans call for the remodel of a educational facility.

For LED Lighting Upgrades in the Ridgeview Elementary. RFP & project questions: MYESCO Phil Beemer at (616) 481-5015 or pbeemer@myesco.com 1. Electrical Permit will be pulled with the State of Michigan by the E.C. MYESCO will assist in the permit application to ensure a smooth process with the state. 2. Provide 1 for 1 replacement of all fixtures per their fixture tag. 3. New occupancy sensors and power packs will be installed per the drawings. 4. Where rewiring is needed, all MC cable, fittings, etc. shall be provided by the E.C. 5. New Dimmers will be installed in each classroom per the Typical Classroom Dimming Control Detail. Note of the front of room and smart board will need to be verified and adjusted accordingly. New stainless steel cover plates to be provided by the EC with one toggle switch and one decora opening. All 0-10v dimming wire will be provided by the EC (18ga stranded, 2 conductors, non-shielded). 6. Rooms other than classrooms, new dimmers and dimming wire to be installed per the scope of work plans. Refer to the Electrical Notes and locations per the plans. 7. Where existing emergency fixtures are being replaced by new flat panel fixtures, remote emergency indicator lights/test buttons provided shall be installed next to the fixture in the grid. 8. The electrical contractor shall be responsible for the removal of existing fixtures from the campus. Dumpsters touch points shall be placed on plywood to protect the existing parking lots from damage. 9. All fixtures must be supported per the NEC. All flat panel fixtures should have all (4) hurricane clips supported over the grid. All other fixtures must have (2) means of support at minimum, likely tie wires on opposite corners up to building structure. 10. The Electrical contractor shall maintain clean working conditions daily and is responsible for the entire clean-up upon completion. The only work associated with this project is the lighting work and so no other general cleaning services will be provided. 11. Scissor lift to be included and provided by the EC.

Post-Bid

Educational

$200,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
337
Bidding Soon
3,235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

June 6, 2026

Project location map

15480 Three Oaks Rd, Three Oaks, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.