BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work and paving for a road / highway in Dublin, Georgia. Completed plans call for site work for a road / highway.

Sealed bids are invited for projects requiring the provision of all labor, equipment, grading, striping, materials, and any other necessary items to complete the projects. Payment will be based on quantities in place, and bids should specify the unit price. All work must comply with Department of Transportation guidelines and requirements for asphalt resurfacing. Roadway intersections that meet the resurfaced road must have a properly tapered 6-foot apron for a smooth transition, and all residential driveways must also have a tapered apron for smooth transition onto the roadway. The contractor is responsible for all traffic control and the posting of construction signs as required by MUTCD. Upon award, the successful bidder must submit a certificate of workers compensation, liability insurance, E-Verify compliance, and provide payment and performance bonds. The contractor must complete the projects by the specified deadline. The Contractor shall be responsible for completing the projects by July 1, 2026. Laurens County: 1) Approximately 0.80 miles of asphalt resurfacing in Joy Lane Subdivision using 9.5mm asphalt @165 lbs. per SY beginning at Academy Extension. Pavement width is 18 feet Approximately 697 tons of 12.5 mm of asphalt No striping 2) Approximately 0.60 miles of asphalt resurfacing in Irish Lake Subdivision using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Snellbridge Road. Pavement width is 18 feet Approximately 525 tons of 9.5 mm asphalt No striping East Dublin: 1) (TIA PI# 0018713) Approximately 460'X 20' long of asphalt resurfacing on Nobles Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Shady Lane and ending at Central Drive. Pavement width is 20 feet Approximately 85 tons of 9.5 mm asphalt Center line striping only @ 5" width 2) (TIA PI# 0018715) Approximately 297'X 20' long of asphalt resurfacing on Daniels Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Manning Street and ending at Williams Street. Pavement width is 20 feet Approximately 55 tons of 9.5 mm asphalt Center line striping only @ 5" width 3) (TIA PI# 0018717) Approximately 370'X 20' long of asphalt resurfacing on Hill Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Buckeye Road to dead end. Pavement width is 20 feet Approximately 68 tons of 9.5 mm asphalt Center line striping only @ 5" width 4) (TIA PI# 0018719) Approximately 410'X 20' long of asphalt resurfacing on Merlin Drive using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Hawkway Drive to Dead End. Pavement width is 20 feet Approximately 75 tons of 9.5 mm asphalt Center line striping only @ 5" width 5) (TIA PI# 0018721) Approximately 1730'X 20' long of asphalt resurfacing on Carroll Drive using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Railroad Avenue and ending at Hwy 80 E. Pavement width is 20 feet Approximately 318 tons of 9.5 mm asphalt Center line striping only @ 5" width 6) (TIA PI# 0018714) Approximately 735'X 20' long of asphalt resurfacing on Shady Lane using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Nobles Street to Dead End. Pavement width is 20 feet Approximately 135 tons of 9.5 mm asphalt Center line striping only @ 5" width 7) (TIA PI# 0018716) Approximately 314'X 20' long of asphalt resurfacing on Lisa Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Jordan Street and Dead End. Pavement width is 20 feet Approximately 58 tons of 9.5 mm asphalt Center line striping only @ 5" width 8) (TIA PI# 0018718) Approximately 1333'X 20' long of asphalt resurfacing on Hawkway Drive using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Northside Drive and Dead End. Pavement width is 20 feet Approximately 245 tons of 9.5 mm asphalt Center line striping only @ 5" width 9) (TIA PI# 0018720) Approximately 612'X 20' long of asphalt resurfacing on Williams Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Ferry Street and ending at Macon Street. Pavement width is 20 feet Approximately 113 tons of 9.5 mm asphalt Center line striping only @ 5" width 10) (TIA PI# 0018722) Approximately 522'X 20' long of asphalt resurfacing on Allen Way using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Gateway Drive and ending at Northside Drive. Pavement width is 20 feet 11) (TIA PI# 0018723) Approximately 0.69 miles of asphalt resurfacing on Clover Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Broad Street to the end. Pavement width is 20 feet Approximately 670 tons of 9.5 mm asphalt Center line striping only @ 5" width City of Dexter: 1) Approximately 0.48 miles of asphalt resurfacing on North Green Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Hwy 257 and ending at Smith Drive. Pavement width is 20 feet Approximately 465 tons of 9.5 mm asphalt Center line striping only @ 5" width 2) Approximately 0.44 miles of asphalt resurfacing on Park Lane Drive using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Hwy 257 and ending at Smith Drive. Pavement width is 20 feet Approximately 426 tons of 9.5 mm asphalt Center line striping only @ 5" width 3) Approximately 0.50 miles of asphalt resurfacing on Cemetery Road using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Hwy 257 and ending at end of pavement. Pavement width is 20 feet Approximately 484 tons of 9.5 mm asphalt Center line striping only @ 5" width 4) Approximately 0.30 miles of asphalt resurfacing on Pineway Drive using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Railroad Street and ending at Harvey Street. Pavement width is 20 feet Approximately 290 tons of 9.5 mm asphalt Center line striping only @ 5" width City of Dudley: 1) Approximately 0.20 miles of asphalt resurfacing on First Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Fields Street and ending at Hwy 80. Pavement width is 20 feet Approximately 194 tons of 9.5 mm asphalt Center line striping only @ 5" width 2) Approximately 0.42 miles of asphalt resurfacing on Third Street using 9.5mm asphalt @165 lbs. per SY beginning at the intersection of Railroad street and ending at Hwy 80. Pavement width is 20 feet Approximately 407 tons of 9.5 mm asphalt Center line striping only @ 5" width

Award

Roads / Highways

$681,156.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
73
Bidding Soon
708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 2, 2026

Project location map

Multiple Locations, Dublin, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.