Published March 12, 2026 at 8:00 PM

Updated March 20, 2026

Site work and new construction of a municipal facility in Chaska, Minnesota. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

**As of March 11, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** City of Chaska Municipal Services Building Make Bids in duplicate in exact accordance with the proposal form in the Project Manual, and sign in long-hand. No oral, telegraphic or fax bids will be accepted or considered. Combined bids including multiple bid categories will be accepted. However, in order to be considered bidders must also submit separate individual bids in addition to the combined bid. Combined bids will not be accepted if individual bids are not submitted. Each separate bid or combined bid must appear alone on a bid form and submitted in separate envelopes. Submit with each bid a certified check, bank money order or acceptable bidders bond issued by a surety meeting city requirements payable to the City of Chaska in the amount equal to five percent (5%) of the total bid. For requirements, please reference specification section 00 21 00 - Supplementary Instructions to Bidders. All bids will be evaluated by the Owner, the Architect and the Construction Manager. The Owner reserves the right to accept any bid or reject any or all bids, or parts of such bids and waive informalities or irregularities in bidding. Successful bidders will be required to furnish satisfactory Labor and Material Payment Bond, Performance Bond, and Certificates of Insurance and a signed contract within 10 days of award of contract. No bidder may withdraw his/her bid for at least 60 days after the scheduled bid opening. The successful bidder must be a "responsible contractor. The term "responsible contractor" means a contractor as defined in Minnesota Statutes Section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The schedule for the project is to commence work May 2026 with substantial completion scheduled for September 2027. ** bid date info : The name and address of the Bidder must be shown on the outside of the envelope. The date and time of the bid is to be noted on the label. Bids received after this time will not be accepted and will be returned unopened. Make Bids in duplicate in exact accordance with the proposal form in the Project Manual, and sign in long-hand. No oral, telegraphic or fax bids will be accepted or considered. The project work scope consists of a new municipal services building complete, along with adjacent road and utility work (OUTLOT C), and a new Fuel Island (OUTLOT B). Please direct all inquiries to Simon Midtbo, RJM Construction at 612-513-4201 or simon.midtbo@rjmconstruction.com

Bid Results

Municipal

$3,889,000.00

Public - City

New Construction, Site Work

1

30

143

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
0
Bidding Soon
850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.