BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Davenport, Iowa. Completed plans call for site work for a road / highway.

The proposed work includes all labor, materials, tools, supplies, utility and transportation services, equipment, and all incidentals necessary for the 15th Street Mill & Overlay Project from Harrison Street to Brady Street. All work must strictly comply with the provided plans and specifications. Bids must be submitted electronically, and late, paper, faxed, or emailed submissions will not be accepted. Bidders must register as a supplier in the electronic system. Bids must be free of all sales taxes. For bids over $100,000, a Bid Bond of 5% of the bid amount is required, and awarded contractors will need to furnish a Performance Bond for 100% of the contract amount. The contractor is required to complete all work, including final cleanup and removal of equipment, by May 31, 2026. Liquidated damages are set at $500.00 per day. Bidders must include a Certificate of Insurance for General Liability, Workers Compensation, and Vehicle insurance with the bid. Manufacturers written warranties and guarantees are also required. All work is governed by the Specifications, General Contract Conditions, and Instructions to Bidders. Payments will be made monthly. Preference is given to products and provisions grown and coal produced within the State of Iowa. The City reserves the right to reject any or all bids and waive technicalities or irregularities. Contractors must ensure non-discrimination in employment, and potential prime contractors are encouraged to contact DBE subcontractors. Please be aware that all Contractor vehicles and major equipment, excluding personal vehicles, must bear the name of the contractor in at least two locations. Rented major equipment must bear the name, address and telephone number of the rental company. Please see SUDAS 1080, 1.11 Contractor's Equipment Identification for further details. This project is located on 15 th Street from Harrison Street to Brady Street. The proposed improvements include, but are not limited to, the furnishing of all labor, materials and equipment necessary for the milling and overlay of the existing asphalt roadway, ADA sidewalk and ramps, resetting of all existing utility surface features to finish grade, replacement of the adjacent alley approaches, paint striping, topsoil, sodding, and erosion control. The quantities herein represent the Engineers estimate of the amount of work to be completed. Actual as-built quantities may vary from bid quantities.

Award

Roads / Highways

$200,845.00

Public - City

Paving, Site Work

13

5

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 1, 2026

Project location map

To be determined, Davenport, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.