Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 6, 2026 at 8:00 PM
Updated May 20, 2026
Addition to an educational facility in Charleston, South Carolina. Completed plans call for the addition of a 22,000-square-foot, one-story above grade educational facility.
The work includes, but is not limited to, the construction of a new, one-story, 22,000 SF building addition located on the existing James Island ES campus at 1872 Grimball Rd, Charleston, SC 29412. General Contractors may submit qualifications. The RFQ may be requested from Lauren Sitnik at lsitnik@bstonegroup.com. Project Delivery Method : Design -Bid -Build Requests for interpretation of this RFQ and any other questions concerning the RFQ shall be made in writing and addressed to Lawrence Lutrario, Construction Procurement Officer with a copy to Program Manager, and received no later than 12:00 P.M. on January 15, 2026 Emailed questions are acceptable, but it shall be the sender's responsibility to confirm receipt by the Charleston County School District or the Program Manager. Email: debra_coen@charleston.k12.sc.us with a copy to lstinik@bstonegroup.com. The work includes, but is not limited to, the construction of a new, one-story, fully sprinkled, 22,000 square foot building addition located on the existing James Island Elementary School campus (1872 Grimball Road, Charleston, SC 29412). The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. The roof system is a 2-ply modified bitumen system. Mechanical system is an air-to-air direct expansion system with dedicated outdoor air units. Finishes will include but are not limited to: SVT, ceramic and quarry tile, sealed concrete flooring, carpet, acoustical ceilings, paint, casework, and marker/tack boards. The package includes basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of the installation of utilities, paving, sidewalks, curb & gutter, fencing, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD's Educational Specifications and Design Requirements. The project will be constructed in a single phase with full project completion by May 2028.
Post-Bid
Educational
$7,000,000.00
Public - County
Addition
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2026
July 21, 2026
1872 Grimball Rd, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Jan 29 2026
Charleston, SC
Bid Date: Jan 28 2026
Charleston, SC
Bid Date: Feb 16 2026
Charleston, SC
Bid Date: Feb 12 2026
Charleston, SC
Bid Date: Feb 13 2026
Charleston, SC
Bid Date: Feb 23 2026
Charleston, SC
Bid Date: Feb 24 2026
Charleston, SC
Bid Date: Feb 24 2026
Charleston, SC
Bid Date: Jan 28 2026
Charleston, SC
Bid Date: Jan 28 2026
Charleston, SC
Bid Date: Feb 24 2026
Charleston, SC
--
Charleston, SC
Bid Date: May 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
