BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2026 at 8:00 PM

Updated May 20, 2026

Addition to an educational facility in Charleston, South Carolina. Completed plans call for the addition of a 22,000-square-foot, one-story above grade educational facility.

The work includes, but is not limited to, the construction of a new, one-story, 22,000 SF building addition located on the existing James Island ES campus at 1872 Grimball Rd, Charleston, SC 29412. General Contractors may submit qualifications. The RFQ may be requested from Lauren Sitnik at lsitnik@bstonegroup.com. Project Delivery Method : Design -Bid -Build Requests for interpretation of this RFQ and any other questions concerning the RFQ shall be made in writing and addressed to Lawrence Lutrario, Construction Procurement Officer with a copy to Program Manager, and received no later than 12:00 P.M. on January 15, 2026 Emailed questions are acceptable, but it shall be the sender's responsibility to confirm receipt by the Charleston County School District or the Program Manager. Email: debra_coen@charleston.k12.sc.us with a copy to lstinik@bstonegroup.com. The work includes, but is not limited to, the construction of a new, one-story, fully sprinkled, 22,000 square foot building addition located on the existing James Island Elementary School campus (1872 Grimball Road, Charleston, SC 29412). The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. The roof system is a 2-ply modified bitumen system. Mechanical system is an air-to-air direct expansion system with dedicated outdoor air units. Finishes will include but are not limited to: SVT, ceramic and quarry tile, sealed concrete flooring, carpet, acoustical ceilings, paint, casework, and marker/tack boards. The package includes basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of the installation of utilities, paving, sidewalks, curb & gutter, fencing, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD's Educational Specifications and Design Requirements. The project will be constructed in a single phase with full project completion by May 2028.

Post-Bid

Educational

$7,000,000.00

Public - County

Addition

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
49
Bidding Soon
755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

July 21, 2026

Project location map

1872 Grimball Rd, Charleston, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.