BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2026 at 8:00 PM

Updated March 20, 2026

Site work for an educational facility in New Haven, Missouri. Completed plans call for site work for a educational facility.

The NEW HAVEN SCHOOL DISTRICT is inviting General Contractors to submit sealed bids for concrete flatwork located on the New Haven School District Campus March 4, 2026 Question Deadline Please contact Dr. Josh Hoener for any questions, requests for clarification or interpretations. March 12, 2026 Award Notification/Notice to Proceed -South Driveway Entrance- o Tear out and remove existing concrete and asphalt in designated areas, including curb and gutter. o Locate drainage pipe and install French drain and corrugated pipe to collect water o Install new rock base material for sub grades and compact to satisfactory o Install approximately 3740 sqft of broom finished concrete o @6" thick o Gator bar or rebar reinforcement installed with a 2 ft grid o Includes a new gutter where the driveway meets Elton St. o North edge of the driveway aligns to the north edge of the front sidewalk. o Tear out a section of front sidewalk shaded in red on the following page. Add this area into the driveway detailed above. This will add approximately 55 sqft to the original area. This additional area will be poured at the elevation of the driveway, not the existing sidewalk. o Install approximately 100 ft roll/vertical curb along west side of driveway along the fenced playground area o Saw cut controlled joints for expansion and contraction of concrete o Tear out and replace a section of concrete attached to the playground o Install approximately 400 sqft of broom finished concrete o @4" thick o Gator bar or rebar reinforcement installed with a 3 ft grid -Front Sidewalk- (Formally known as Option 1) o Tear out and replace a section of concrete in the front sidewalk o Install approximately 225 sqft of broom finished concrete o @4" thick o Gator bar or rebar reinforcement installed with a 3 ft grid

Award

Educational

$43,289.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
131
Bidding Soon
1,565
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

July 1, 2026

Project location map

201 Elton St, New Haven, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.