BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Remodeling of a stadium in Columbia, Missouri. Completed plans call for the remodel of a stadium.

Sealed bids are requested for the "Mizzou Arena - Main Court Floor Replacement" at the University of Missouri in Columbia, Missouri, under Project Number CP260131, with a construction estimate of $700,000 - $785,000. Bids must be submitted through the University of Missouri's Unity Construct bid module. Drawings, specifications, and contract information are available through the Unity Construct project management software, with electronic bid sets available at no cost. The project has participation goals for Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Service-Disabled Veteran Business Enterprises (SDVE) set at 10% MBE, 10% WBE, and 3% SDVE. The Owner reserves the right to waive informalities in bids and to reject any and all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding commercial conditions and bidding policies should be directed to John Moon at (573) 882-0544 or moonj@missouri.edu. Questions regarding the scope of work or technical requirements should be directed to Chris Davis with Peckham and Wright Architects, Inc. at (573) 449-2683 or cdavis@pwarchitects.com. This can be done via phone or email, but it is preferred that the bidder uses the Question/Response feature in Unity Construct Bid Module. General Description of Work 1. Project consists of the replacement of the existing Main Court wood flooring system at Mizzou Arena. 2. Demolition includes removal of the existing wood flooring system, designated concrete slabs and associated electrical and communication condiuits and wiring along with the in-floor connection boxes and items as further shown on the drawings. 3. Architectural work shall include placing new concrete in designated areas, new cable troughs, connection boxes, wood flooring system, doors, hardware and overhead coiling door and items as further shown on the drawings. 4. Electrical work shall consist of routing power to new outlets, underslab conduits, etc... and as further shown on the drawings.

Bid Results

Arenas / Stadiums

$907,500.00

Public - State/Provincial

Remodeling

13

18

9

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

May 18, 2026

Project location map

To be determined, Columbia, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.