Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Site work for a civil project in Naperville, Illinois. Completed plans call for site work for a water / sewer project.
**As of March 11, 2026, this project has not yet been awarded. The project is expected to be awarded on March 18, 2026.** The Work to be performed under this Contract consists of the replacement of sump pumps, discharge piping, and associated electrical wiring and conduits. The work also includes the installation of VFDs and the upsizing of a main power distribution panel. In addition, the project includes the installation of new discharge piping and related earthwork. Question Deadline 02/16/2026 at 12:00 PM CT Question Response Deadline:February 19, 2026, 12:00pm A. Work Specified Herein and Elsewhere B. This Section includes the basic materials and methods required for the work of Division 5, Metals A. Systems integrator shall provide all components listed in these specifications or as shown on the project drawings except item 6 below. Section includes 1. New Control Cabinet enclosure 2. PLC and digital and analog I/O cards, 3. 15" HMI, X2 Pro 15 4. pump VFDs 5. relays, indicator lights, selector switches and all associated PLC software and programming. 6. CTs for each terminal. 7. VFD circuit breakers Existing panel will be modified on site for installation. Qualified electrical contractor is responsible for installing and providing all external conduit, external I/O wiring and communications wiring according to the drawings and specifications. General Contractor (Contractor) is responsible for protection of existing control panel prior to and after installation and will hold contractor responsible in the event the control panel is damaged. Contractor is responsible for conducting a field verification test of all I/O points with owner's systems integrator and is responsible for field wiring modifications if necessary, to ensure proper equipment operation. Control panel provided by integrator and installed by Contractor. System integrator's work include cable terminations inside the existing control panel and shall coordinate installation with general contractor's electrician. Systems integrator's work includes any modifications inside the existing control panel, which includes but not limited to, PLC fabrication, testing, programming, field installation, debugging, start-up, commissioning, cable, conduit and terminations in order to provide a fully functional system to the satisfaction of the Engineer and Owner. System integrator to supply two copies of O&M/Data sheets for all components to GC. B. Systems integrator is responsible for all PLC programming, computer software programming, software licenses, communications programming, and control system integration. Contractor shall coordinate start-up and operation of integrator equipment with systems integrator. All questions concerning this bid shall be submitted in writing prior to the question due date. The deadline for questions is Monday, February 16, 2026 by 12:00 p.m.
Award
Water / Sewer
$516,632.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
March 27, 2026
Multiple Locations, Naperville, IL
Related To This Project
Naperville, IL
--
Naperville, IL
Bid Date: Mar 03 2026
Naperville, IL
Bid Date: Mar 03 2026
Naperville, IL
Bid Date: Feb 25 2026
Naperville, IL
Bid Date: Feb 17 2026
Naperville, IL
Bid Date: Mar 06 2026
Naperville, IL
Bid Date: Feb 11 2026
Naperville, IL
--
Naperville, IL
--
Naperville, IL
Bid Date: Feb 04 2026
Naperville, IL
Bid Date: Feb 06 2026
Naperville, IL
Bid Date: Jan 28 2026
Naperville, IL
Bid Date: Feb 03 2026
Naperville, IL
Bid Date: Jan 13 2026
Naperville, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
