Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work for a civil project in Naperville, Illinois. Completed plans call for site work for a water / sewer project.

**As of March 11, 2026, this project has not yet been awarded. The project is expected to be awarded on March 18, 2026.** The Work to be performed under this Contract consists of the replacement of sump pumps, discharge piping, and associated electrical wiring and conduits. The work also includes the installation of VFDs and the upsizing of a main power distribution panel. In addition, the project includes the installation of new discharge piping and related earthwork. Question Deadline 02/16/2026 at 12:00 PM CT Question Response Deadline:February 19, 2026, 12:00pm A. Work Specified Herein and Elsewhere B. This Section includes the basic materials and methods required for the work of Division 5, Metals A. Systems integrator shall provide all components listed in these specifications or as shown on the project drawings except item 6 below. Section includes 1. New Control Cabinet enclosure 2. PLC and digital and analog I/O cards, 3. 15" HMI, X2 Pro 15 4. pump VFDs 5. relays, indicator lights, selector switches and all associated PLC software and programming. 6. CTs for each terminal. 7. VFD circuit breakers Existing panel will be modified on site for installation. Qualified electrical contractor is responsible for installing and providing all external conduit, external I/O wiring and communications wiring according to the drawings and specifications. General Contractor (Contractor) is responsible for protection of existing control panel prior to and after installation and will hold contractor responsible in the event the control panel is damaged. Contractor is responsible for conducting a field verification test of all I/O points with owner's systems integrator and is responsible for field wiring modifications if necessary, to ensure proper equipment operation. Control panel provided by integrator and installed by Contractor. System integrator's work include cable terminations inside the existing control panel and shall coordinate installation with general contractor's electrician. Systems integrator's work includes any modifications inside the existing control panel, which includes but not limited to, PLC fabrication, testing, programming, field installation, debugging, start-up, commissioning, cable, conduit and terminations in order to provide a fully functional system to the satisfaction of the Engineer and Owner. System integrator to supply two copies of O&M/Data sheets for all components to GC. B. Systems integrator is responsible for all PLC programming, computer software programming, software licenses, communications programming, and control system integration. Contractor shall coordinate start-up and operation of integrator equipment with systems integrator. All questions concerning this bid shall be submitted in writing prior to the question due date. The deadline for questions is Monday, February 16, 2026 by 12:00 p.m.

Award

Water / Sewer

$516,632.00

Public - City

Site Work

15

20

2

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
271
Bidding Soon
3,246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

Multiple Locations, Naperville, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.