BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2026 at 8:00 PM

Updated March 12, 2026

Site work for a water / sewer project in Redlands, California. Completed plans call for site work for a water / sewer project.

Work In This Contract: Work in this Contract includes all labor, materials and equipment necessary for construction of Wastewater Treatment Plant Slope Stabilization and Stairway Improvements Project, Project No. 521038 as noted on the Contract Drawings and all other Contract Documents and is summarized as follows 1. The Work shall consist of furnishing and constructing retaining walls, v-ditch, vdrains, u-ditch, grate inlets, concrete block slough wall, reinforced concrete stairway, installing type A, and appurtenances; all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping and restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to preconstruction conditions. 2. The Contractor shall, upon completion of the pipeline construction and appurtenances required herein, initially operate all components of the Contract Work furnished and installed by Contractor, and make any additional adjustments, corrections, repairs, replacements, and reconstructions necessary to provide the City with complete, correctly operating pipeline and appurtenances. The Work shall consist of constructing retaining walls, v-ditch, v-drains, u-ditch, grate inlets, concrete block slough wall, reinforced concrete stairway, and appurtenances, landscaping, and irrigation. Question Deadline 02/05/2026 at 2:00 PM PT Online Q&A Yes. All questions related to this project shall be directed to Goutam Dobey, Project Manager, at 909-798- 7584 Ext 2.

Bid Results

Water / Sewer

$462,304.00

Public - City

Site Work

11

19

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

April 1, 2026

Project location map

35 Cajon St, Redlands, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.