BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2026 at 8:00 PM

Updated March 20, 2026

Site work for a transportation facility in Chappell, Nebraska. Completed plans call for site work for a transportation facility.

The scope of work includes replacement of Runway 12-30 and taxiway lighting, beacon, and wind cone at Billy G. Ray Field in Chappell, NE. Work consists of installation of 5kV L-824 cable (9,930 LF), 600V cable (1,778 LF), counterpoise (8,766 LF), conduit (10,093 LF), a 4 kW regulator, vault work, runway and taxiway lights (81 units), retro-reflective markers (15 units), beacon with tip-down pole, wind cone, and seeding.

Award

Transportation Terminals

$352,785.00

Public - City

Site Work

22

15

11

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
73
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 20, 2026

Project location map

To Be Determined, Chappell, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.