BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

THE BOARD OF EDUCATION OF THE CITY OF CHICAGO invites prequalified General Contractors to bid on the project/projects referenced Bidding Contractors are required to be pre-qualified with the Chicago Public Schools for this project. The form of agreement for the work will be the General Contracting Services Agreement. PAYMENT AND PERFORMANCE BOND: 100% of the Base Contract Price A bid bond in the amount of five percent (5%) of the total Bid price is required. Any question or doubt as to the true meaning and intent of the Drawings or Specifications must be referred to the Architect/Engineer of Record for response. Oral responses by the Architect/Engineer of Record or Board's Representative are not binding on the Board. PRE-CONSTRUCTION MILESTONES Milestone Completion Date Contractor’s Scheduler’s Qualifications Due (01 32 16) 03/26/2026 Preliminary Baseline Construction Schedule Due (01 32 16) Within seven (7) days of receipt of Notice of Award 03/17/2026 Full Submittal Schedule Due (01 30 00) 03/26/2026 Site Utilization Plan Due 03/17/2026 Long Lead Material Log Need an accurate, comprehensive and complete list of all the Long Lead items for this project. List must include: ? Date of planned submittal submission into eBuilder. ? Number of days to complete manufacturing after submittal approval. ? Date material/item will be onsite. ? Highlight any and all issues and bring to the attention of the PMO PM immediately. Chiller is estimated @ 8-10 weeks (based on a 154 ton unit) plus an additional 2 weeks for transit. Need to add an additional 2 weeks since so many schools are bidding at once. Pumps and Drives - allow at least 6 - 8 weeks plus another week for transit for those items. Pre-Construction Meeting 03/18/2026 Submittal of SOV Due (01 20 00) Schedule of Values shall be submitted no later than 14 days following the date established on the Notice to Award, but no later than 14 days prior to the date scheduled for submittal of initial Application for Payment. 03/31/2026 CPM Construction Schedule Due (01 32 16) Due within (4) days of approval of the Preliminary Baseline Construction Schedule. List of Assigned Personnel Due (01 30 00) 03/17/2026 All Shop Drawings with Long Lead Materials to be Submitted by 03/31/2026 Issuance of Building Permit 03/31/2028 – GC is responsible for providing all subcontractors to AOR & signed Easy Permit(s) by NTP. Submission of Pre-Construction Photos Due (01 30 00) 03/31/2026 - Prior to Mobilization Delivery of Moving Boxes [If Applicable] N/A Estimated Total Labor Hours (00 73 00) GC is responsible for providing breakdown of total labor hours organized by trade. CONSTRUCTION MILESTONES Milestone Completion Date Contractor Partial Mobilization for Roofing Scopes (following issuance of NTP and Permit), for Tear-Off, Temp Roofing, etc. [Note that the educational process cannot be interrupted or otherwise hampered by construction. All demolition and any construction that will cause load noises or pose any hazards to Students or Staff, must be done on off-hours or days/times when Students are not present in the School Building] N/A Contractor Full Mobilization 06-09-2026 Milestone N/A Completion of all Interior Scope of Work N/A Completion of Contractor Final Deep Clean 8-3-2026 Turnover Date for any areas that will be cleaned by School’s Custodial Staff 8-10-2026 Equipment Start Up and Testing Must be scheduled M-Th unless otherwise approved by PM Completion of all Exterior Scope of Work 8-3-2026 Drinking Water Fixture Flushing, Ready for Testing N/A POST-CONSTRUCTION MILESTONES Milestone Completion Date Preliminary Acceptance 8/01/2026 Completion of Punch List 09/01/2026 Submission of all Close Out Documentation (01 77 00, 01 77 00.01, 01 78 00 & 01 78 00.01) 08/01/2026 Final Completion (60 days from PA): 10/01/2026 11-Month Warranty Walkthrough (From PA) 07/01/2027

Bid Results

Educational

$754,000.00

Public - City

Renovation

45

21

11

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
688
Active Projects
418
Bidding Soon
4,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

March 30, 2026

Project location map

1711 N California Ave, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.