BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2026 at 8:00 PM

Updated March 20, 2026

Site work and paving for a road / highway in Revere, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Suffolk Downs Phase 1R Offsite Roadway Improvements - Route 1A On-Ramp Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The project includes infrastructure, sidewalk, center median and guardrail reconstruction and improvements on Route 1A Southbound from the on-ramp at mile marker 52.4 to approximately mile marker 52.1 in the City of Revere, Massachusetts. The improvements include enhancements to the pedestrian and roadway facilities, the installation of new hot mix asphalt sidewalks, new cement concrete pedestrian ramps, removal and modification to existing medians, installation of vertical granite curbing, full depth pavement reconstruction, box widening, structural mill and overlay, new pavement marking installation, and installation of new signage. The goals for this project are a minimum of: (1) a minority employee work force goal of 15.30 percent, (2) a women employee work force goal of 6.90 percent, (3) a goal of 7.24 percent participation of Minority-owned Business Enterprise(s), and (4) a goal of 3.60 percent participation of Woman-owned Business Enterprise(s) within the project Contract.

Award

Roads / Highways

$1,066,693.00

Public - City

Paving, Site Work

44

7

11

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
7
Bidding Soon
2,328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

April 27, 2026

Project location map

Multiple Locations, Revere, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.