BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work for a water / sewer project in Westborough, Massachusetts. Completed plans call for site work for a water / sewer project.

**As of March 20, 2026, this project has not yet been awarded. A contract will not be awarded until after the funding is appropriated by vote at Town Meeting held on 3/21. ** FY26 Westborough Wastewater Treatment Plant Improvements - Includes replacement of: two (2) UV Influent Slide Gates; two (2) Grit Screws; two (2) Grit Classifiers; Wetwell Exhaust Fan; Odor Control Scrubber and the Chemical Feed system; the Headworks Area gas detection system; select odor control dampers; and relocation of the existing autosampler. Other work includes Modifications to the Headworks Motor Control Center (MCC) Room and the replacement of the Headworks MCC and the Headworks Bar Screen Control Panel and providing temporary power and controls to all Headworks mechanical and electrical equipment to maintain continuous plant operations during the removal and replacement process. QA date - 3-6-2026 All questions by prospective Bidders as to the interpretation of the Contract Documents shall be submitted in writing to the ENGINEER and shall be received at least five (5) business days before the date set for the receipt of the Bids. Questions from Filed Subbidders shall be received five (5) business days prior to the Filed Sub-bid opening date, set herein. Questions from General Contractors shall be received five (5) business days prior to the opening of the General bid opening date

Bid Results

Water / Sewer

$5,515,590.00

Public - City

Site Work

73

21

16

7

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
6
Bidding Soon
2,661
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

May 12, 2026

Project location map

238 Turnpike Rd, Westborough, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.