BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and new construction of an educational facility in Carlisle Brks, Pennsylvania. Completed plans call civil work for a primary / secondary education facility.

Sealed bids are invited for construction of Carlisle Middle School, Waggoners Gap Road, Carlisle, Pennsylvania. Separate, sealed bids will be received for the following Prime Contracts: General Construction, Site Construction, Heating, Ventilating and Air Conditioning Construction, Plumbing Construction, and Electrical Construction. Bids must be submitted in sealed envelopes clearly marked with the bidder's name and the project name. This Project has 5 Prime Contracts, each with an estimated value as follows: 3224-1 General Construction $37,961,000 3224-2 Site Construction $10,233,000 3224-3 Heating Ventilating and Air Conditioning Construction $9,606,000 3224-4 Plumbing Construction $3,822,000 3224-5 Electrical Construction $7,557,000 Total $69,179,000 Bidders may obtain bidding documents in electronic (.pdf) format or hard copy by written request. Required bidder information includes mailing address, representative's name, telephone number, facsimile number, email address, and requested contract(s) and contract number(s). Bidding documents are available for examination through several listed construction exchanges. Each bid must include a bid security equal to 10% of the Base Bid amount and all alternate bid amounts, in the form of a Bid Bond. Successful bidders must provide a Performance Bond and a Payment Bond, each for 100% of the contract amount, with corporate surety. Bids may not be modified, withdrawn, or cancelled for 60 calendar days after opening, except as permitted by law. The school district reserves the right to reject any or all bids or waive irregularities, and to award any combination of alternates or none at its discretion. This project is subject to Pennsylvania's prevailing wage requirements, and corporations not organized in Pennsylvania must secure appropriate authorization to do business in the Commonwealth. The Project consists of construction of a new Middle School and associated parking, drives, outdoor learning areas, and athletic field. B. Generally, the new construction consists of load bearing masonry, structural steel columns, steel joists and metal deck, masonry veneer, exterior metal wall panels, membrane roofing system, aluminum storefront and curtain wall systems, casework and interior finishes along with the specified mechanical, electrical, plumbing and fire protection systems. Electrical Construction Contract 3760-5: The Electrical/Data Networking Contract includes the furnishing and installation of the electrical power distribution, lighting, and special systems, plus other construction operations traditionally recognized as Electrical Construction. Work under this prime contract includes, but is not limited to, the following: a. All Electrical Construction work indicated on these Contract Documents. b. EC shall provide the following other site work, including cutting, trenching, and backfilling: i. Site lighting and controls, including light pole concrete bases and associated excavation and backfill. ii. Exterior generator, manual transfer switch, and associated electrical between the generator and school, including the generator pad. iii. Exterior CCTV pole mounted camera pathways (wiring, CCTV cameras and mount to be provided and installed by Owner). iv. Exterior pathways for future EV charging stations as indicated on electrical site plan. v. Illuminated and non-illuminated decorative bollards. vi. Other site elements requiring power including, but not limited to, site monument signs, flag pole lights, etc. c. Spoilsfrom electrical construction excavation shall be permitted to be placed on-site in designated stockpiles noted on the Civil drawings. Final grading of these stockpiles shall be by the SC. d. Exterior equipment pads and interior housekeeping pads for electrical equipment. e. See Site Utility Division of Responsibility below for detail regarding the EC scope of work for site utilities, including electrical and telecommunications services. f. All work described in the following specification sections. Division 0 - Bidding and Contract Requirements All Sections Division 1 - General Requirements All Sections Divisions 2 through 14 - General Construction No Specific Sections* *see note 'g' below Divisions 21 and 22 - Plumbing Construction No Specific Sections* *see note 'g' below Division 23 - Heating, Ventilating and Air Cond. No Specific Sections* *see note 'g' below Division 26 - Electrical All Sections Division 27 - Communications All Sections Division 28 - Electronic Safety and Security All Sections Divisions 31, 32 & 33 - General Construction No Specific Sections* *see note 'g' below g. Where Specification Sections included in the Scope of this Prime Contract reference provisions of Specification Sections of another Prime Contract, those provisions shall be included in the Work of this Prime Contract as if the referenced Specification Sections are included in their entirety in the Specification Sections for this Prime Contract.

Bid Results

Educational

$7,000,000.00

Public - City

New Construction, Site Work

335

34

324

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
187
Bidding Soon
1,833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

May 1, 2026

Project location map

900 Waggoners Gap Rd, Carlisle Brks, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.