BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and renovation of a civil project in Darien, Georgia. Completed plans call for site work for a road / highway; water / sewer project; for the renovation of a water / sewer project; and for paving for a road / highway.

Installation of erosion and sediment control facilities, +-350 LF 18" C900 DR 18 PVC water main, +- 1 fire hydrant assemblies, pavement removal and replacement, connection to existing water mains, and appurtenances. Installation of one (1) 1250 GPM Deep Well pump, chlorine equipment, pump house, electrical items, meter, piping, telemetry system, and associated appurtenances. Bids will only be accepted from well drillers licensed by the State of Georgia. All work on the Project must be completed within 240 consecutive calendar days of date of notice to proceed. No bid will be considered unless sealed and filed with the McIntosh County Industrial Development Authority, Georgia prior to the time set forth above, and accompanied by a Bidder's Bond, payable to McIntosh County Industrial Development Authority, Georgia, for 10 percent of the amount of the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required Payment Bond and Performance Bond and Insurance Certificates. Both the Payment Bond and Performance Bond shall be equal to 100% of the contract amount. Bids arriving after the designated time will be returned unopened. McIntosh County encourages Section 3 Businesses to participate in the bidding process. Question Deadline 02/25/2026 In general, no answer will be given to an oral question if the answer involves an interpretation of the intent or meaning of the Contract Documents or Plans, or the equality or use of products or methods other than those definitely designated or described on the Plans or in the Specifications. To receive consideration, such questions shall be submitted in writing to the Engineer at least 7 days before the advertised date for receipt of bids.

Bid Results

Water / Sewer

$1,950,622.00

Public - County

Paving, Renovation, Site Work

22

16

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
56
Bidding Soon
882
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 3, 2026

Project location map

Multiple Locations, Darien, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.