Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 2, 2026 at 8:00 PM
Updated April 3, 2026
Renovation of a municipal facility in Chickamauga, Georgia. Completed plans call for the renovation of a 910-square-foot municipal facility.
Walker County, Georgia is soliciting proposals from qualified vendors for the construction and interior finishing of two offices, two hallways, one bathroom, and one kitchen area . Work will include framing and installation of new walls, flooring, and ceiling tile. Walker County Government reserves the right to accept or reject any and all proposals, to waive formalities, technicalities or irregularities and to re-advertise if necessary. This Scope of Work defines the responsibilities and deliverables for Framing and MEP (Mechanical, Electrical and Plumbing) trades to complete/finish the interior buildout of the above referenced project. All work shall comply with applicable local, state, and federal codes and will be coordinated with other trades to ensure proper integration. Scope of Work: o Walls o Frame and construct new walls per specified dimensions. o Install drywall, finish, and paint as required. o Flooring o Install new flooring throughout all offices, hallway, bathroom, and kitchen. o Flooring type to be determined (e.g. vinyl, tile, etc.). o Ceiling Tile System o Install suspended ceiling grid system with acoustic ceiling tiles in the lobby area and new office, hallway, bathroom, and kitchen. o Ensure integration with lighting and HVAC as needed. o The ceiling tile coverage is expected to match the total floor area (910 sq ft), pending any soffits or exclusions. o Electrical o Install four (4) new wall sockets in each office and one hallway. o Verify outlets meet code requirements for spacing and capacity. o Windows o Remove two (2) windows o Install one (1) new window in Office 1, size and style to be confirmed by the project owner. Additional Notes: o Contractor shall provide all labor, materials, and equipment required for the above work. o Work must comply with all applicable building codes and standards. o Coordination with electrical and plumbing permit requirements (particularly for the bathroom and kitchen) will be required. o Final finishes (paint colors, flooring material selections, tile type) will be approved by the project owner prior to installation. Bid Result : HL Construction - 01 - Office 1 - $ 8,048.00 02 - Office 2 - $ 12,839.00 03 - Hallway 1 - $ 9,832.00 04 - Hallway 2 - $ 10,900.00 05 - Bathroom - $ 4,135.00 06 - Kitchen - $ 4,654.00
Award
Municipal
$50,408.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
March 16, 2026
91 Industrial Dr, Chickamauga, GA
Related To This Project
Chickamauga, GA
Bid Date: Dec 11 2025
Chickamauga, GA
Bid Date: Nov 13 2025
Chickamauga, GA
Bid Date: Nov 13 2025
Chickamauga, GA
Bid Date: Oct 16 2025
Chickamauga, GA
Bid Date: Apr 17 2025
Chickamauga, GA
Bid Date: Mar 07 2025
Chickamauga, GA
Bid Date: Mar 25 2021
Chickamauga, GA
Bid Date: Aug 13 2024
Chickamauga, GA
--
Chickamauga, GA
--
Chickamauga, GA
Bid Date: Jul 02 2024
Chickamauga, GA
Bid Date: Mar 29 2024
Chickamauga, GA
Bid Date: Mar 17 2022
Chickamauga, GA
Bid Date: Jul 26 2023
Chickamauga, GA
Bid Date: Jun 12 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
