BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2026 at 8:00 PM

Updated March 28, 2026

Site work and paving for a road / highway in La Center, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of March 13th, 2026, this project has been awarded to Vertex Contracting LLC for $463,785.** All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashiers check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal.Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the (City of La Center). Consists of installing signs, striping and guardrail as shown on the plans and specifications. Technical inquiries regarding the project should be directed to Tony Cooper, City Engineer, at City of La Center, 210 E. 4th Street La Center, WA 98629, (360) 263-2889. Work shall be completed within 55 working days after receipt of Notice to Proceed. The City reserves the right to reject any and all bids submitted, or to accept the bid deemed to be in the best interest of the City of La Center, and to waive any informalities or irregularities in any bid. No bidders may withdraw their bid after the hour set for the opening thereof unless the award of contract is delayed for a period exceeding one-hundred twenty (120) calendar days. Doc notes: Informational copies of maps, plans and specifications are on file for inspection in the Office of the City Engineer, (City Of La Center), Washington

Award

Roads / Highways

$463,785.00

Public - City

Paving, Site Work

29

5

8

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

Multiple Locations, La Center, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.