BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2024 at 7:00 PM

Updated November 6, 2024

Remodeling of a clubhouse / community center in La Center, Washington. Completed plans call for the remodel of a clubhouse / community center.

Please send all questions to tcoleman@ci.lacenter.wa.us. We will provide an email response to all questions. No questions will be answered after, Monday, October 21, 2024. Schedule: The contractor must complete work within 45 business days of a mutually accepted start date;work to be completed no later than January 31, 2025. Bond: Each bid shall be accompanied by a bid bond, postal money order, cash, cashier's check or certified check payable to the City of La Center in the sum of five (5%) percent of the bid amount, to be forfeited to the city by the successful bidder if he/she fails to enter into a contract and file an acceptable surety bond in the amount of 100% of the contract price within ten (10) calendar days of the award. The city reserves the right to reject any and all bids and to accept the bid deemed most advantageous to the City of La Center and to waive all informalities in the bidding. It is the contractors responsibility to understand and respond appropriately to the bid request. 1. Main Room. West Wall. Install four (4) new windows on west wall 33.5" X 56" Glazing U value 0.27; for west wall with 2X6, R21 Insulation, sheetrock, mud, tape, trim out windows exterior and interior, paint interior wall and trim. Run conduit for future pull or run CAT6 Cable inside walls. 2. Main Room. North & South walls. Replace two (2) windows each on North and South walls; remove 4 existing size 33.5"H X 46" W, replace with 4- 33.5"H X 56" W glazing U value of 0.27; Fur wall with 2X6, insulate R21, sheet rock, trim out windows exterior and interior, paint interior wall and trim. 3. Main Room. Ceiling. Remove existing lighting Install 1/2 " sheetrock over the existing lids of woman, men and common area rooms. Install new lighting fixtures. Account for the same number that are existing. Mud, tape and paint. Flooring. Install commercial waterproof laminate 14mm thick wood flooring. 4. Storage Room. Install cabinets removed from kitchen. 5. Kitchen. Remove existing kitchen cabinets 15' L X 9-9" H X 18" D and reinstall in storage room. Sheetrock if needed, or patch and paint, prior to installation of stainless-steel worktables, that will be secured to wall. City to purchase/provide stainless-steel worktables for installation. 6. Woman and Men restrooms. Interior. (15ft L X 9-9' H ~105 SQ FT EA) Install new flooring, Fur one interior wall (S. Side Woman, N. Sid Men), insulate, sheetrock, paint, install new lid (over existing tiles). Replace sinks in both. Install commercial waterproof laminate 14mm thick wood flooring. Install trough urinal in Men. 7. Woman and Men Restrooms. Exterior. In both, epoxy coat floor, install stainless steel toilet and sink, paint walls (dark lower 1/2 and lighter color upper 1/2 ), replace windows, install changing stations. 8. Exterior Entrance. Wrap existing poles with Faux Stone. Install cedar lid in the portico/entrance. Paint existing polesto tie into wrap. Replace existing metal doors with commercial glass double door, tempered 1/4 inch glass, self-closing with clear anodized finish. 9. HVAC. The city will contract out an HVAC company to look at the existing system installed in 2018, and coordinate balancing the air handling units within the building at the time of construction.

Post-Bid

Clubhouse / Community Centers

$300,000.00

Public - City

Remodeling

3

3

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
34
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

December 5, 2024

Project location map

1000 E 4th St, La Center, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.