Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 21, 2026
Site work and new construction of a mixed-use development in Doral, Florida. Completed plans call for the construction of a recreation facility; parking garage; fire / police facility; for site work for a recreation facility; fire / police facility; and parking garage.
The City of Doral is soliciting Proposals for full pre-construction and construction management at risk services for the Doral Central Park Parking Garage and Recreation Area located at 3005 NW 92nd Avenue, Doral, FL 33172. Background By way of this RFP, the City of Doral (City) is soliciting competitive sealed proposals from parties capable of providing full pre-construction and construction management related services (the "Services") for the construction of a new Police Department Headquarters Building, as described herein. Through the process described herein, persons and/or firms interested in assisting the City with the provision of the Services must prepare and submit a Statement of Qualification in accordance with the procedure and schedule in this RFP. The City will review submittals only from those persons and/or firms that submit a response that includes all the information required by this RFP, the determination of which shall be in the sole discretion of the City. The City intends to hire a qualified Pre-Construction Manager (PCM) to provide Pre-Construction consulting services and a Construction Manager at Risk (CMR) to provide construction phase services including guaranteeing the maximum cost of construction through a Guaranteed Maximum Price contract (GMP). This latter service will be an option with the successful Pre-Construction Manager or any other qualified firm at a later date. Selection of the PCM/CMR will be a selection method based on the Criteria Evaluation and Scoring addressed this RFP. Due to the size and complexity of the project, along with the interface necessary with a diverse set of project stakeholders, both internal and external, the City seeks a qualified Pre-Construction Manager (PCM)/Construction Manager at Risk (CMR) to coordinate the day to day facilitation, communication and management of the Pre- Construction and the Construction of this project for the various components described in this RFP. It is anticipated that the Construction Manager at Risk (CMR) will be responsible and accountable to manage several second-tier contractors. Cut-off Date for Written Questions: February 20, 2026, 5:00pm The project principally consists of the construction of a new Police Department Headquarters. The proposed project consists of a three-story building with approximately 62,933 gross square feet which will serve as the primary operational, administrative, and community-facing facility for the Police Department, located at 3719 NW 97th Avenue, Doral, FL 33178. The new headquarters is intended to support modern law enforcement operations, enhance the City of Doral public safety services, and accommodate current and future departmental needs. The facility is efficiently organized and is anticipated to include administrative offices, secure operational areas, evidence storage, training and meeting spaces, and public service areas, designed to meet applicable codes, security requirements, and sustainability goals. The total estimated Construction Cost for this project is projected to be approximately $50,000,000.00
Award
Fire / Police
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2026
October 29, 2026
3379 NW 97th Pl, Doral, FL
Related To This Project
Doral, FL
Bid Date: Feb 18 2026
Doral, FL
Bid Date: Mar 11 2026
Doral, FL
Bid Date: Feb 27 2026
Doral, FL
Bid Date: Mar 19 2026
Doral, FL
Bid Date: Mar 25 2026
Doral, FL
Bid Date: Mar 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
