BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Renovation of a medical facility in Sacramento, California. Completed plans call for the renovation of a medical facility.

**As of March 18th, this project was awarded to Truebeck Construction for $2,936,555.** The existing diagnostic imaging equipment in rooms 1835H and 1835I at the University of California Davis, Sacramento Campus, Davis Tower will be removed and replaced with new diagnostic imaging equipment provided by Philips Medical Systems. Work is to occur in two phases, with sequencing to be determined in collaboration with the user group during design validation. Additional work includes upgrade of finishes, lighting, casework/furniture system, plumbing, HVAC, and medical gas in these rooms. There will be an associated renovation of the control area in each room to accommodate the new equipment. Other work includes equipment anchorage to the floor and rerouting of electrical utilities below the floor as required to support the imaging equipment requirements. Pre-qualification requirements: The following design-build teams have been prequalified to submit proposals on this project: Clark Construction/LPA Design Studios, Colin Construction/Aspen Street Architects, Truebeck Construction/Nacht & Lewis Architects. Proposers must attend a mandatory virtual pre-proposal conference in its entirety to be allowed to propose on the project. The successful proposer will be required to have the following California contractor's license at the time of the proposal opening: “B” – General Building. Proposal security in the amount of 10% of the Lump Sum Base Proposal, excluding alternates, must accompany each bid. All insurance policies required to be obtained by the Design-Builder shall be subject to approval by the University and must be issued by an approved insurer. All inquiries shall be directed only to: Leila Couceiro, Contracts Manager Facilities Planning & Development 4800 2nd Avenue, Suite 3010, Sacramento, CA 95817 Email: lccouceiro@health.ucdavis.edu Question Deadline 02/09/2026

Award

Medical

$2,936,555.00

Public - State/Provincial

Renovation

148

25

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
217
Bidding Soon
2,221
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 17, 2026

Project location map

4800 2nd Ave, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.