BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Remodeling and renovation of an educational facility in Middletown, Connecticut. Completed plans call for the renovation of a educational facility.

This project is therefore subject to the state set-aside goals of 25% SBE and 6.25% MBE on the entire state contract amount. Question Deadline 03/06/2026 at 3:00 PM ET Last Day for RFIs The work of this contract includes, but is not limited to the following The abatement and demolition of existing finishes, HVAC, electrical, and plumbing fixtures in eight gang restrooms and installation of all new finishes, HVAC, electrical and plumbing fixtures for the eight gang restrooms. The restrooms are in two separate buildings, Wheaton and Snow Hall. Each building has two restrooms per floor, (2 floors) totaling 4 restrooms each. The layouts are identical on both floors and both buildings. The work shall take place May 20, 2026, through August 14, 2026. (86 calendar days) The contractor shall begin the work on the second-floor restrooms in both Wheaton and Snow Halls simultaneously. This will leave the first-floor restrooms available for use by faculty and staff that work in the buildings over the summer. Once the second-floor restrooms are complete and Certificate of Occupancy is issued by OSBI, work shall commence on the first-floor restrooms. The faculty and staff in the building will then use the newly renovated restrooms on the second floor as work commences on the first-floor restrooms. Connecticut State Colleges & Universities (CSCU) - Wheaton & Snow Hall bathroom renovations at Middlesex Community College - The work of this contract includes, but is not limited to the following: The abatement and demolition of existing finishes, HVAC, electrical, and plumbing fixtures in eight gang restrooms and installation of all new finishes, HVAC, electrical and plumbing fixtures for the eight gang restrooms. The restrooms are in two separate buildings, Wheaton and Snow Hall. Each building has two restrooms per floor, (2 floors) totaling 4 restrooms each. The layoutsare identical on both floors and both buildings - The work shall take place May 20, 2026, through August 14, 2026.(86 calendar days) PERFORMANCE AND PAYMENT BONDS shall be furnished by the successful bidder awarded the contract in an amount of 100% of the Contract Sum *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$497,000.00

Public - State/Provincial

Remodeling, Renovation

10

34

12

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,222
Active Projects
717
Bidding Soon
8,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 20, 2026

Project location map

100 Training Hill Rd, Middletown, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.