BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2026 at 7:00 PM

Updated April 1, 2026

Site work and addition to a day care center in Cerritos, California. Completed plans call for the addition of a day care center; and for site work for a day care center.

Bid No. PW2600000006, Child Development Center (CDC) - Expansion Project Description. The scope of Work and all related general notes and construction notes on the Drawings and Specifications for the Project are included as a part of these Contract Docum ents. Crews m ust be staffed as necessary to m eet the bid schedule and will be finalized in the Contractor’s subm itted and approved project schedule. DESCRI PTI ON OF W ORK The scope of work for this Contract includes, but is not limited to, those areas described within this section, and all sections listed within the Technical Specification. The Work to be perform ed by the Contractor is outlined in this Section and includes all Work shown on the Drawings, construction notes, general notes and Technical Specifications. A. Pedestrian and Vehicle Access. Contractor shall provide and m aintain safe access for all pedestrian and vehicle traffic during the course of the Project. B. Noise Elim ination. Contractor shall provide all noise and vibration eliminator, as required, to reduce noise levels to the extent as shown and indicated in the Contract Docum ents. There shall be no disruption to the operations of Cerritos College (“College”) and/ or the education of students. C. Restoring Areas to Original Condition. Contractor is responsible for m aintaining, replacing or restoring all areas to their original condition due to all tem porary shoring, barriers, fencing, gates, guardrails, signs, etc. which have been dam aged or tem porarily removed by the Work of this Contract. D. Fencing. Contractor is responsible for relocating existing fence and for furnishing and installing tem porary fencing per the Contract Docum ents. E. Signage. Contractor is responsible for all traffic, pedestrian, construction and regulatory signage as required or necessary to m eet all governing regulatory requirem ents. F. Debris Rem oval. Contractor shall m aintain an adequate labor work force, as required on a daily basis, to properly clean up all the debris associated with Contractor's work. All rubbish/ debris resulting from Contractor's operation will bedeposited directly into dum psters, or sim ilar rubbish containers (collectively “Dumpsters”), provided by this Contractor. Contractor shall be responsible for removal and disposal of full Dum psters. Contractor shall provide receipt of all rubbish/ debris removal for the College's waste diversion program . All efforts shall be m ade to recycle those item s that can be recycled. All recycled item s must be properly documented and a receipt provided to the College for its waste diversion program . All questions about the m eaning or intent of the Contract Docum ents are to be directed in writing to the District. Interpretations or clarifications considered necessary by the District in response to such questions will be issued in writing by Addenda em ailed, faxed, m ailed, or delivered to all parties recorded by the District as having received the Contract Docum ents.

Post-Bid

Day Care Centers

$8,000,000.00

Public - County

Addition, Site Work

241

25

4

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
597
Active Projects
281
Bidding Soon
2,871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

May 5, 2026

Project location map

11051 166th St, Cerritos, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.