Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a road / highway in Great Bend, Kansas. Completed plans call for site work for a road / highway.
**As of April 10, 2026, the project was awarded to straight-line striping, with an awarded amount of $112,311.45.** Reference Number 0000411160 Question Deadline 02/16/2026 Questions concerning this Request for Proposal may be addressed to: Chris Schartz County Works Director 2401 7th Street, P.O. Box 518 Great Bend, KS 67530 620-793-1816 cschartz@bartoncounty.org The 2026 Highway Striping Project includes painting centerline and edge line markings on approximately 97 miles of blacktop roads in Barton County, Kansas. Roads have been identified. Complete scope of project included in bid document. The project consists of approximately 97 miles of chip sealed roadways to be striped with 4" yellow centerline stripes, 4" white edge lines, and 4" white lane lines (where applicable). Refer to the Summary of Quantities for estimated linear feet of striping materials required. A breakdown of measured striping lengths for each location is available by contacting the Barton County Engineer. No removal of existing pavement markings is necessary prior to striping. Striping is to be as per the requirements of the 2007 KDOT Standard Specifications and applicable KDOT standard plan sheet dimensions and layouts unless otherwise noted. Glass bead application is to be at a rate of 7 lb. of glass beads per gallon of paint. Apply paint at a wet film thickness of 16 mils at an approximate rate of 3.4 gallons of paint per 1,000 feet of striping material for 4-inch solid lines. The Summary of Quantities reflects the actual feet of material required for each type of stripe. All quantities have been increased 10% for contingencies. The contractor is to apply the paint and beads at the plan rates stated above unless approved otherwise by the County. Traffic striping paint is to be a Standard Fast Dry Waterborne Traffic Paint meeting the requirements of Federal Spec. TT-P-1952F Type I and II. Glass beads are to meet AASHTO M 247, Type I specifications. 9. 10. The layout ofcenterline no passing zones will be done by Barton County personnel. 11. Payment to the contractor will be made based on actual quantities of work performed and materials furnished at the unit prices approved at the time of bid. Invoices for payment must be broken out as per the bid items. The owner reserves the right to increase or decrease the quantities based on field adjustments. 12. The commencement of the work is dependent on the County's progress in completing the planned chip seal work for this year. The contractor is to stay in contact with the County Works Director, Chris Schartz, at 620 793-1936 to determine the approximate date when striping may begin. The striping work is to be completed within 15 working days after the Notice to Proceed is issued
Award
Roads / Highways
$112,311.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2026
March 25, 2026
Multiple Locations, Great Bend, KS
Related To This Project
Great Bend, KS
Bid Date: Mar 24 2026
Great Bend, KS
Bid Date: Mar 18 2026
Great Bend, KS
Bid Date: Jun 05 2026
Great Bend, KS
Bid Date: Jun 05 2026
Great Bend, KS
Bid Date: Jun 05 2026
Great Bend, KS
Bid Date: May 22 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.