BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 27, 2026

Renovation of a mixed-use development in Kings Bay, Georgia. Completed plans call for the renovation of a military facility.

A request for information and market survey regarding the potential use of a Project Labor Agreement (PLA) for the renovation of Unaccompanied Enlisted Personnel Housing Quarters at Naval Submarine Base Kings Bay, Georgia. Work may include renovation of Buildings 1042, 1044, 1045, 1046, and 1054, with scopes involving upgrades to mechanical systems, fire protection and fire alarms, bathrooms, and multiple exterior and interior elements. Mechanical work includes replacement of HVAC air handling units, installation of direct digital controls for temperature and humidity, replacement of chilled water piping and circulation pumps, and cleaning of ductwork. Plumbing work includes replacement of plumbing fixtures, domestic water piping, and sanitary piping. Electrical repairs include replacement of service panels, wiring and wiring devices not meeting current codes, and installation of LED lighting fixtures. Exterior renovation includes replacement of gutters, windows, doors, safety railings, lights, and painting of exterior walls. Interior renovation includes bathroom remodeling, mold remediation, cleaning and repainting of existing surfaces, replacement of flooring, and demolition and reconstruction of ceilings and non-loadbearing walls to allow access for mechanical and plumbing rebuilds. The project also requires design services for hazardous material abatement based on an existing industrial hygiene survey. The effort will follow a design-bid-build approach, with an estimated magnitude between $25M and $100M and an anticipated performance period of approximately 1100 calendar days. Public responses on the use of a PLA are requested via the attached questionnaire. The magnitude of construction is anticipated to be $25M - $100M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$100,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
59
Bidding Soon
951
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

August 3, 2026

Project location map

1216 USS Daniel Boone Ave, Kings Bay, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.