BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a mixed-use development in Gillette, Wyoming. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Install approximately 1150 LF of 8" PVC storm drain main and 330 LF of 4" PVC storm drain lateral services with standard trenching, including curb inlets, cleanouts, fittings, and appurtenance upgrades within Bennelli Drive between Derringer Drive and Express Drive; Red Ryder Drive; and Sako Drive from Glock Avenue to Musket Court. Includes limited width full depth removal and replacement of approximately 315 SY of asphaltic concrete pavement, PCC curb and gutter, PCC sidewalk, PCC valley gutter, and aggregate base course to support utility installation efforts, and landscaping as appropriate and identified in the plans. Alternate work includes remove and replace approximately 210 LF of 8" PVC storm drain main and 30 LF of 4" PVC storm drain lateral services with standard trenching, including curb inlets, cleanouts, fittings, and appurtenance upgrades within Bennelli Drive between Glock Avenue and Derringer Drive. Includes limited width full depth removal and replacement of approximately 50 SY of asphaltic concrete pavement, PCC curb and gutter, PCC sidewalk, PCC valley gutter, and aggregate base course to support utility installation efforts, and landscaping as appropriate and identified in the plans. Question Deadline 02/16/2026

Bid Results

Water / Sewer

$298,114.00

Public - City

Paving, Site Work

21

7

4

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
7
Bidding Soon
122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

Multiple Locations, Gillette, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.