BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Renovation of an educational facility in Gillette, Wyoming. Completed plans call for the renovation of a educational facility.

As of March 23, 2026, project was awarded to Quality Interiors Inc, awarded amount is $89,265.99. Accepting bids for new carpet at Wright Jr. Sr. High School. 1. Removal and disposal of carpet in Classroom areas 2. Removal of Cove Base in Classroom areas 3. Install 24"x24" Learning Lab: Concept 00550 Quarter Turn Pattern 4. Install 4" Carbon Cove Base 00001 5. Removal and Replacement of Transition Strips Patcraft is CCSD preferred carpet manufacture. 6" black cove base to be installed. Carpet, tile and cove base installation is to follow manufacture specs, if not replacement of carpet will fall back to contractor's responsibility. Any damage to surrounding features not specified in the scope will be the responsibility of the contractor to repair or replace. An addition 3% of carpet/tile is to be supplied to CCSD for future carpet square replacement at location. Question Deadline 02/24/2026 Each Bidder shall examine the bidding Document carefully and no later than three (3) days prior to the date of receipt of Bids shall make a written or verbal request to Campbell County School District for interpretation or correction of ambiguity, inconsistency or error therein which he may discover.

Award

Educational

$89,266.00

Public - County

Renovation

4

4

3

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
86
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

June 1, 2026

Project location map

109 N Gurley Ave, Gillette, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.