Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work and paving for a road / highway in Richfield, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Roadway pulverizing pavement removal, pavement milling, resurfacing and shouldering. The work will include approximately 26,450 S.Y. pulverize asphalt, full depth; 51,080 S.Y. mill asphalt, 2"; 6,365 S.Y. remove pulverized material at C.D.S.; 5,260 C.Y. base patch removal; 10,480 tons crushed aggregate base course, 1-1 4" dense; 7,890 S.Y. soil stabilization fabric; 3,970 tons lower layer, HMA pavement 2.5" mix; 9,310 tons upper layer, HMA pavement 2.0" mix; 1,735 tons 2' shoulder - imported recycled asphalt _"; and 1 L.S. traffic control. The project is part of a Local Road Improvement Program (LRIP) and consists of roadway reconstruction of the existing street, including hot mix asphalt pavement, crushed aggregate base course, and recycled asphalt shoulders. Question Deadline 02/12/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Joshua Molter at the office of the Engineer: Cedar Corporation. Phone: 920-241-4276.

Award

Roads / Highways

$1,009,892.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
112
Bidding Soon
2,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

June 1, 2026

Project location map

Multiple Locations, Richfield, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed