BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a stadium in Bangor, Maine. Completed plans call for the renovation of a stadium.

**As of April 24th, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** Any exception to the provisions in the Scope of Services/Specifications must be marked in the body of this document and itemized on a separate page titled "Exceptions", referenced by section number and paragraph, along with a detailed explanation of the exception. All sports lighting fixtures and all equipment must be thoroughly inspected, serviced and ready for use upon installation. All work performed must meet established industry standards of quality to be acceptable. Any unacceptable work must be corrected before payment is issued. 1. All fixtures shall utilize spill light and glare control devices including but not limited to, internal shields, louvers, and external shields. 2. To minimize impact on neighbors and adjacent properties, features, readings, and specifications shall be included that indicate minimization of glare and spill light. 3. All components shall be designed and manufactured as a system. All fixtures, wire harnesses, drivers and other enclosures shall be factory assembled, aimed, wired, and tested. 4. All exposed components shall be constructed of corrosion resistant material and/or coated to help prevent corrosion. All exposed carbon steel shall be hot dip galvanized per ASTM A123. All exposed aluminum shall be powder coated with high performance polyester or anodized. All exterior reflective inserts hall anodized, coated, and protected from direct environmental stainless steel of 18-8 grade or better, passivated and coated with aluminumbased thermosetting epoxy resin for protection against corrosion and stress corrosion cracking. Structural fasteners may be carbon steel and galvanized meeting ASTM 153 and ISO/EN 1461 for hot dipped galvanizing or ASTM B695 for mechanical galvanizing. All wiring shall be enclosed within cross arms, pole, or electrical components enclosure. Question Deadline 02/10/2026 at 4:30 PM ET Any questions must be directed in writing to bids@bangormaine.gov The City is requesting proposals to replace the current lighting fixtures and associated attachment structures at Mansfield Stadium. This facility is a baseball venue that hosts various levels of baseball from Junior Little League age through college play.

Bid Results

Arenas / Stadiums

$207,418.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
29
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

March 27, 2026

Project location map

100 Mansfield Street, Bangor, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.