BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and paving for a mixed-use development in Cavetown, Maryland. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As per the Owner the project has been Withdrawn. Description: This project, located in Washington County, is for the construction of a portion of MD 66 (Mapleville Road) from 940 feet south of the MD 64 intersection and extending in the northerly direction for 250 feet north of the intersection for a total distance of 0.23 miles. The project includes the construction of a portion of MD 64 (Jefferson Boulevard) from Old Georgetown Road and extending in an easterly direction to MD 77 for a total distance of 1.44 miles. The work will consist of the following: (a) Roadway milling and resurfacing/overlay (b) Full depth pavement patching and full depth pavement widening (c) Ditch trimming and brush removal (d) Traffic barrier and traffic barrier end treatments (e) Erosion and Sediment Control measures (f) Signing and Pavement Marking (g) Traffic signal removal and reconstruction (h) Curb and gutter replacement (i) Landscaping (j) Maintenance of Traffic (k) Grading and Earthwork (l) Storm drain pipes and structures Pre-Bid Conference: A Pre-Bid Conference has not been scheduled for this Project Classification: E - $2,500,001 to $5,000,000 In accordance with State Finance and Procurement Title 13 of the Annotated Code of Maryland, no bid, performance or payment bonds are required for bids less than $100,000.00. However, bids $100,000.00 and above will not be considered unless a Bid Security is submitted as outlined in the Invitation for Bids. Bid Security shall equal at least five percent (5%) of the total amount bid. Also, the successful bidder will be required to supply Payment and Performance Bonds for all Contracts in excess of $100,000.00 The MDOT SHA reserves the right to reject any and all bids. MDDOT - 103 - MD 64 (Jefferson Boulevard) ATMD 66 (Mapleville Road) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Request for information or questions shall be addressed to: Maryland State Highway Administration Office of ConstructionWage and Hour Team 7450 Traffic Drive, Building #4 Hanover, MD 21076 or Email: wageandhourteam@sha.state.md.us

Final Planning

Roads / Highways

$5,000,000.00

Public - State/Provincial

Paving, Site Work

86

6

91

8

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
238
Bidding Soon
3,493
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

September 21, 2026

Project location map

Mapleville Rd & Jefferson Blvd, Cavetown, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.