BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Sierra Vista, Arizona. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project proposes the construction of a phased pocket park. The site improvements included in this first phase of the park include a base scope of work as well as a bid-add alternate scope of work which may or may not be awarded based on available funds and budget variables. The base scope of work includes tasks such as site grading, the construction of concrete sidewalks and slabs, drainage improvements, grouted rip-rap, culvert installation, some landscape, some irrigation, as well as empty conduit with pull strings for future lighting and electrical needs. The bid-add alternate scope of work includes additional landscape and irrigation along Fab Avenue and south of the concrete slabs. Also included in the bid-add alternate are decorative screen panels, a park monument sign, shade structure and LED-lighted splash pad- pending funding. In is noted that another project will be in the process of being constructed along Fab Avenue at about the same time as this project is being carried out. The Contractor will need to coordinate with work being performed on project TR-087 Sierra Vista Connectivity Phase 2. This project includes street improvements on Fab Avenue from Fry Blvd to Veterans Dr. These improvements include sidewalk construction, curb, gutter and sidewalk, asphalt parking along the existing street as well as a scupper that will drain onto the west side of the park property. It shall be the Contractor's responsibility to complete the work specified here within and supply any incidental services or accessories necessary to make the work complete and perfect in all respects and ready for operation. Any apparatus, appliance, material, or work not mentioned in the Specifications, or vice versa, or any incidental appurtenances necessary for the system to operate as to the intent of these Specifications, even if not particularly specified, shall be included in the bid price and furnished, delivered, and installed by the Contractor without additional expense to the City of Sierra Vista. The City of Sierra Vista acquired the 1.26-acre property on the southeast corner of Fry and Fab Avenue in October 2020. Once the property was acquired the City used an EPA Brownfield Grant administered by Cochise County to fund conceptual designs for its future redevelopment. The purpose of the redevelopment was to address longstanding drainage issues south of the intersection of Fab and Fry, and to add more public parking needed for a more pedestrian-focused area of town. The proposed pocket park will also provide a public gathering space to serve as a venue for events at the west end of the City and to help encourage people to enjoy the area. On June 12th, 2025, the Sierra Vista City Council voted to dedicate the planned City Park, as the Henry Jones Legacy Park in honor of the man who was a former Buffalo Soldier and known as the West End night watchman. Henry Jones was not only a former Buffalo Soldier but was a veteran of two world wars. After Fort Huachuca closed in 1947, Jones took it upon himself to patrol the community each night. At the time, there was no local law enforcement and Jones patrolled our small community from 7th Street to the gates of the fort until Sierra Vista was incorporated in 1956. Since the Fab Avenue property is located in the heart of the historic West End that Jones patrolled, it is an ideal place to honor his legacy. This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act ("IIJA"), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget's Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18,2022. Bids may be withdrawn through the City's e-Procurement Portal, the responding firm may "unsubmit" their proposal in OpenGov. After withdrawing a previously submitted proposal, the responding firm may submit another proposal at any time up to the deadline for submitting proposals prior to the bid opening. No bidder may withdraw his bid for a period of ninety (90) days following the bid openings. The Contract shall be awarded to the lowest responsive, responsible, and eligible bidder qualified to participate in federally funded projects. The City reserves the right to waive any informality in bids received, and to accept, increase, or reduce the quantities of any or all items of any bid proposal, unless the bidder qualifies such bid by specific limitation. Question Deadline 02/20/2026 at 5:00 PM MT Question Response Deadline:February 27, 2026, 5:00pm All questions related to this IFB shall be submitted in writing through online . All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on online . ** pre bid info : Site Visit (Non-Mandatory):Immediately following Pre-Bid Meeting Henry Jones Park Site S/E Corner of Fry Boulevard and Fab Avenue Sierra Vista, Arizona 85635 The project proposes the construction of a phased pocket park. The site improvements included in this first phase of the park include a base scope of work as well as a bid-add alternate scope of work which may or may not be awarded based on available funds and budget variables. The base scope of work includes tasks such as site grading, the construction of concrete sidewalks and slabs, drainage improvements, grouted rip-rap, culvert installation, some landscape, some irrigation, as well as empty conduit with pull strings for future lighting and electrical needs. The bid-add alternate scope of work includes additional landscape and irrigation along Fab Avenue and south of the concrete slabs. Also included in the bid-add alternate are decorative screen panels, a park monument sign, shade structure and LED-lighted splash pad- pending funding. In is noted that another project will be in the process of being constructed along Fab Avenue at about the same time as this project is being carried out. The Contractor will need to coordinate with work being performed on project TR-087 Sierra Vista Connectivity Phase 2. This project includes street improvements on Fab Avenue from Fry Blvd to Veterans Dr. These improvements include sidewalk construction, curb, gutter and sidewalk, asphalt parking along the existing street as well as a scupper that will drain onto the west side of the park property. A site visit will be conducted immediately following the pre-bid meeting at the Henry Jones Legacy Park site, located on the southeast corner of Fry Blvd and Fab Ave, Sierra Vista, AZ 85635, and will not be hosted online (in-person only). Please refer to Attachment A & B Specifications and Plans for detailed information on this scope of work. A summary of the scope is provided below: The project proposes the construction of a phased pocket park. The site improvements included in this first phase of the park include a base scope of work as well as a bid-add alternate scope of work which may or may not be awarded based on available funds and budget variables. For more information, please contact: Helen Lee Chief Procurement Officer, City of Sierra Vista helen.lee@sierravistaaz.gov

Award

Playgrounds / Parks / Athletic Fields

$192,110.00

Public - City

Paving, Site Work

37

13

12

7

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

April 6, 2026

Project location map

W Fry Blvd & S Fab Ave, Sierra Vista, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.