BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2026 at 8:00 PM

Updated March 18, 2026

Site work and paving for a road / highway in Erin, Wisconsin. Completed plans call civil work for a road / highway.

The Work is generally described as roadway pulverizing pavement removal, pavement milling, chip sealing, resurfacing and shouldering. The Work includes: Asphalt Surface Treatment (Chip Sealing), Pulverize Asphalt Pavement, Milling Asphalt Pavement, New Crushed Aggregate Base, Excavation and Grading, HMA Paving, Roadway Shoulders, Erosion Control, Surface Replacement, and Lawn Restoration. The work, in general, will include the approximate quantities and items listed below: Chip Seal Work: (Approx. 15,760 SY - Double Chip Seal, 18,200 SY - Single Chip Seal) Bituminous Material Gal. 14,920 Aggregate Material - Limestone Tons 351 Aggregate Material - Granite Tons 185 Paving Work: Asphaltic Pavement Pulverizing, Full Depth S.Y. 27,710 Asphaltic Pavement Milling, 4" S.Y. 1,655 Base Patching Excavation C.Y. 1,965 Crushed Aggregate Base and Base Patching Backfill, 1-1/4" Dense Tons 3,925 Crushed Aggregate Base, 3/4" Dense Tons 1,650 Geotextile Soil Reinforcement, SR S.Y. 2,960 Lower Layer HMA Pavement 2.5" Mix Tons 2,210 Lower Layer HMA Pavement 1.5" Mix Tons 660 Upper Layer HMA Pavement 1.5" Mix Tons 1,995 Traffic Bond, Shoulder - 3/4" Dense Tons 830 Asphaltic Flume L.F. 500 Traffic Control L.S. 1 Question Deadline 02/12/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Joshua Molter at the office of the Engineer: Cedar Corporation, 920-241-4276. Questions received less than five days prior to the date for opening of Bids may not be answered 1. Location: Seven sections in the Town of Erin, Wisconsin as follows: a. Schedule 1 - Town Pit Road b. Schedule 2 - Druid Lake Road c. Section 3 - Washington Road d. Section 4 - Kilkee Court e. Section 5 - Limerick Lane f. Section 6 - St. Augustine Road g. Section 7 - Shamrock Lane The Work includes: a. Asphalt Surface Treatment (Chip Sealing) b. Pulverize Asphalt Pavement c. Milling Asphalt Pavement d. New Crushed Aggregate Base e. Excavation and Grading f. HMA Paving g. Roadway Shoulders h. Erosion Control i. Surface Replacement j. Lawn Restoration

Award

Roads / Highways

$631,014.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
175
Bidding Soon
1,984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

Multiple Locations, Erin, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.