Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an educational facility in Warwick, New York. Completed plans call for the renovation of a educational facility.
SED #: 44-21-01-06-0-001-052 Reference Number 0000411609 Warwick Valley High School Gym Ac Upgrade General Requirements - Bid Deposit Required - Certified Payroll - FOB Destination - Installation Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % Each Bidder shall deposit with its bid, security in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the "Instructions to Bidders." No Bidder may withdraw its bid within forty-five (45) days after the actual bid opening. * The Board of Education reserves the right to waive any and all informalities in or to reject any or all bids. Question Deadline 02/19/2026 Direct questions to Jack Eisenbach, email: jeisenbach@luengineers.com, and John Jouben email: jjouben@luengineers.com. Clarifications requested by bidders must be in writing not less than 7 days before the date set for receipt of bids The work of the prime contracts is identified in this section and in the Drawings. 1. CONTRACT #1 - HVAC a. There are (4) four interior Heating and Ventilating units in the main gym hung from the roof structure above and need to be removed and replaced with 4 new Rooftop Units. b. The contract includes providing new ductwork and associated, structural work, GC work, and painting. This also includes disconnecting the heating lines to the old units and extending the new heating piping to the new rooftop units with having the piping go up inside the base of units. c. The district will furnish the roof curbs for the new rooftop units. The roofer will install the curbs as part of a separate roof replacement project. d. The roofer will cut the holes in the roof as part of a separate project. e. The HVAC contract includes protection of the gym floor, the bleachers, the basketball backboards and any electronics or lights. f. The (4) four new Rooftop units will be purchased by the district and installed by the district. g. Alternate HVAC-1: Provide painting of all supplemental steel for the roof top units. Paint with a brush, one base coat and two finish coats per color chosen by Owner. 2. CONTRACT #2 - ELECTRICAL a. The electrical contract includes disconnecting power to the existing HV units, removing the wire and conduit back to the electric panel, changing the breakers and extending power to the four new RTU's with new conduits and wiring and appurtenances.
Award
Educational
$498,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
