BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2026 at 7:00 PM

Updated February 11, 2026

Site work for a water / sewer project in Lake City, Florida. Completed plans call for site work for a water / sewer project.

Directional Bore Installation on SR247 / Leisure Drive. The City of Lake City, Florida is accepting sealed bids for this project. Bidders are required to create a free account with OpenGov to submit their proposals. Question Deadline 02/24/2026 at 4:00 PM ET All questions must be in writing and directed to the Procurement Director Brian Scott Director of D/C 692 SW Saint Margarets Lake City, FL 32055 Email: scottb@lcfla.com Phone: (386) 758-5456 The Contractor shall furnish all labor, supervision, equipment, tools, permits, traffic control, and incidentals necessary to complete the work, except for those items specifically identified as being furnished by the City. Work includes, but is not limited to: o Directional boring under State Road 247 o Installation of 12-inch FPVC pipe o Tapping and connection to the existing water main o Pressure testing o Coordination with FDOT and City inspections o Restoration and cleanup All work shall conform to the plans provided by the City, including Plan Section A-A, FDOT Directional Drilling Notes, and Water Valve Installation Details. City Responsibilities The City of Lake City will provide the following: 1. Furnish 12-inch FPVC pipe and fittings necessary to hook up to the tap 2. Furnish a designated location for disposal of bore mud (dumping only) 3. Provide City inspection services during construction 4. Supply engineer drawings and plans 5. Provide the FDOT permit number associated with the projectContractor Responsibilities The Contractor shall be responsible for the following, at no additional cost to the City: 1. Obtain and comply with all requirements of the FDOT permit 2. Provide and maintain Maintenance of Traffic (MOT) in accordance with FDOT standards 3. Apply for and maintain a fire hydrant meter with the City o Contact: Shasta Pelham, 386-719-5786 4. Request, maintain, and keep current all 811 utility locates 5. Furnish and install a 12" x 12" tapping saddle and valve 6. Coordinate directly with FDOT for required inspections 7. Furnish all labor and equipment necessary to directionally bore approximately 400 feet of 12- inch FPVC pipe beneath State Road 247 8. Furnish labor and equipment to perform the 12" x 12" tap and connect the pipe to the bore 9. Perform pressure testing of the 12-inch water main from the tap point to the end of the bore at Leisure Drive 10. Restore all disturbed areas in accordance with FDOT and City requirements 3.2. Specifications All work shall be performed in accordance with: o City-provided engineering plans o Plan Section A-A o FDOT Directional Drilling Notes o Water Valve Installation Details o Applicable FDOT, City of Lake City, and Florida standards Contractors are responsible for reviewing all plans and notes prior to submitting a bid. 3.3. Code and Standards All work shall comply with the latest adopted editions of the following, as applicable: o Florida Department of Transportation (FDOT) Standard Specifications, Design Standards, Utility Accommodation Manual, and Maintenance of Traffic requirements o Florida Building Code (FBC) o Florida Administrative Code (FAC) and applicable Florida Statutes o City of Lake City Code of Ordinances and Utility Standards o OSHA safety regulations o AWWA and ASTM standards for water main materials, installation, and testing o Manual on Uniform Traffic Control Devices (MUTCD) The Contractor shall comply with all required permits, including the FDOT Utility Permit. In the event of a conflict, the most stringent requirement shall govern, as determined by the City

GC Bidding

Water / Sewer

$60,000.00

Public - City

Site Work

3

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
97
Bidding Soon
984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

April 10, 2026

Project location map

FL-247, Lake City, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.