Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Site work and new construction of a transportation facility in Honolulu, Hawaii. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.
https://govmarketnews.com/hawaii-airport-modernization-6-9-billion/ The Hawaii Department of Transportation (HDOT) is planning a massive overhaul of its airport system, outlining a $6.9 billion investment to modernize terminals, airfields and support critical facilities. The projects included as part of the nearly $7 billion capital improvement portfolio represent an unprecedented effort to bring Hawai’i’s airport system into the modern age, advancing essential projects to improve safety, maximize efficiency and elevate the customer experience. The capital improvement project breakdown includes: $4.02 billion in terminal improvements. $1.8 billion in airfield work. $1.04 billion in ancillary infrastructure. All projects will be funded exclusively from airport user fees, federal grants, airport revenue bonds and passenger facility charges, requiring no state general funds or taxes. The state has already begun work on several cornerstone projects, supported by a record-breaking $849 million bond issuance in 2025. Roughly $600 million from those bonds will help repair runways, renovate terminals, improve security and build facilities. One of the largest initiatives highlighted in the program is the $2.1 billion Diamond Head Extension Development Program at Daniel K. Inouye International Airport (HNL). The airport has already begun various enabling projects to prepare the site for future development, including the demolition and clearing of existing structures and parking lots. The program will consist of several key components as the airport expands Terminal 2 eastward. These elements include agricultural screening, a security screening checkpoint, airline lounges, concession spaces and a baggage handling system. Additional features will consist of a chiller plant, ramp control office, space for an upcoming ticket lobby, gates for wide-body aircraft and associated utility infrastructure and airfield pavement among other improvements. Plans include relocating existing support facilities such as a vehicle wash rack, triturator and vehicular security access points. At Kahului Airport (OGG), HDOT has a series of projects either already underway or in planning and design that will completely refurbish a significant portion of the airport. Among these, the airport will replace its outbound baggage handling system with a $269 million alternative. These efforts will be further supported by a $83.5 million renovation of the ticket lobby, central building and baggage claim. Improvements will include replacing the ticketing service counters, upper windows, improving security queue lines, installing shades in the garden and potentially replacing the canopy structure. In addition, OGG will make a $60.9 million investment in upgrading the South TSA Checkpoint. An additional section of work at HNL will cover a $100 million Terminal 2 parking structure improvement project. The project consists of rehabilitating the concrete vehicular riding surface on the structure’s top level, repairing concrete spalls and improving the damaged drainage and sewer system components. In addition to overhauling portions of the outdated, damaged electrical systems, the airport will also abate hazardous material. HNL plans to spend another $60 million to build a bus maintenance facility to replace existing infrastructure. The airport will demolish both above and underground infrastructure, install new underground utilities, build electric bus charging stations, a bus maintenance garage, support facilities and abate hazardous materials. HDOT officials anticipate that all projects featured as part of the $6.9 billion program will be completed by either 2032 or 2033. ------------------ Furnish and install tensile shade sails at Daniel K. Inouye International Airport. Terminal 1 (Areas 1 and 2). The shade sail fabric shall be tensioned to the frame by shade sail webbing, and stainless-steel turnbuckles. Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Kam, Gary.
Award
Transportation Terminals
$31,766.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2026
March 30, 2026
300 Rodgers Blvd, Honolulu, HI
Related To This Project
Honolulu, HI
--
Paving Restoration Along State Jurisdiction, Including Emergency Paving, Area 1 - Concrete - 6033752
Honolulu, HI
Bid Date: Mar 13 2026
Honolulu, HI
Bid Date: Feb 09 2026
Honolulu, HI
Bid Date: Mar 13 2026
Honolulu, HI
Bid Date: Mar 25 2026
Honolulu, HI
Bid Date: Mar 25 2026
Honolulu, HI
Bid Date: Mar 27 2026
Honolulu, HI
Bid Date: Feb 18 2026
Honolulu, HI
Bid Date: Feb 18 2026
Honolulu, HI
Bid Date: Feb 18 2026
Honolulu, HI
--
Honolulu, HI
Bid Date: Mar 23 2026
Honolulu, HI
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.