Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Remodeling of a mixed-use development in Tahlequah, Oklahoma. Completed plans call for the remodel of a restaurant.
Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on the best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B." Including But Not Limited To: 1) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 2) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. Contractor shall provide NSU with documentation of compliance at completion of work. 3) Contractor to be responsible for all permits and fees associated with this scope of work. 4) Work may be halted and resumed at any given time according to NSU's needs. 5) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 6) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 7) Contractor shall be responsible for coordinating any and all utility locations for the project. 8) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 9) Contractor is responsible for all field verifications of dimensions and conditions. 10) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 11) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 12) Contractor shall supply restroom facilities for own use during construction. 13) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 14) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 15) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 16) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 17) Contractor shall be responsible for repairing rutted or furrowed greenspace, by means of fill dirt and sod, as deemed necessary by the owner. 18) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 19) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 20) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 21) Contractor shall be responsible for Final Cleaning. This will be to the Owner's discretion. 22) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents 23) Dumpsters, restrooms,contractor parking, material delivery and storage locations will be discussed and determined at the Pre-construction meeting. Question Deadline 02/28/2026 All questions shall be furnished in writing to: Northeastern State University Attention: Christopher Gay Purchasing@nsuok.edu Purchasing Department 600 North Grand Avenue Tahlequah, OK 74464 Any RFIs must be submitted in writing 72 hours prior to the bid opening. No bids may be submitted, changed, or withdrawn after the time of the opening of the bids. All late bids will be unopened and become property of Northeastern State University. It is the responsibility of the bidder to make sure their bid is received by the bid due date and time. Northeastern State University reserves the right to reject any or all bids or to waive any formalities or irregularities in any bid, and to accept the bid or bids which seem most advantageous to the Owner. ** bid date info : The lower left-hand corner of the envelope shall be marked: BID PACKAGE: #B26-06 University Center Underground Cafe Remodel The envelope shall be addressed to: Northeastern State University Attention: Christopher Gay Purchasing Department 600 North Grand Avenue Tahlequah, OK 74464 Bids received after the time or more than ninety-six hours, excluding Saturdays, Sundays and Holidays, before the official stated time set for the opening of bids, will not be accepted.
GC Bidding
Educational
$300,000.00
Public - State/Provincial
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2026
April 1, 2026
605 N Grand Ave, Tahlequah, OK
Related To This Project
Tahlequah, OK
Bid Date: Feb 05 2026
Tahlequah, OK
--
Tahlequah, OK
Bid Date: Feb 10 2026
Tahlequah, OK
Bid Date: Feb 20 2026
Tahlequah, OK
Bid Date: Mar 03 2026
Tahlequah, OK
Bid Date: Feb 26 2026
Tahlequah, OK
Bid Date: Feb 26 2026
Tahlequah, OK
Bid Date: Feb 25 2026
Tahlequah, OK
Bid Date: Feb 24 2026
Tahlequah, OK
Bid Date: Feb 23 2026
Tahlequah, OK
Bid Date: Feb 04 2026
Tahlequah, OK
Bid Date: Feb 24 2026
Tahlequah, OK
Bid Date: Feb 24 2026
Tahlequah, OK
Bid Date: Feb 24 2026
Tahlequah, OK
Bid Date: Feb 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
