Site work and renovation of a civil project in Las Vegas, Nevada. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
This Project will perform a condition assessment of four (4) parallel existing water lines at the Flamingo Water Resource Center (FWRC). The water lines run from the furnace and chiller located in the Secondaries 1-8 Blower Building (Blower Bldg) to the Operational Control Center (OCC). The total length of each water line is approximately 750 feet; around 250 feet of this total length is buried pipe that runs from the OCC to the Utility Tunnel, and the remaining 500 feet runs through the Utility Tunnel to the Blower Bldg. Based on the assessment, the lines will be replaced or rehabilitated as necessary. The limits of replacement may be 250 feet of buried pipes (4 lines in a trench with 12" separation) from the OCC to the Utility Tunnel, or the entire 750 feet of pipes between the OCC and the Blower Bldg. The project is included in the County's 2026-2030 Capital Improvement Program (CIP). As of February 11, 2026, the project is in pre-design. The project is expected to bid publicly to contractors in March of 2026. Construction is expected to begin in July of 2026 and be completed by August of 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com
Conceptual
Water / Sewer
$1,000,000.00
Public - County
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2026
5857 E Flamingo Rd, Las Vegas, NV
Related To This Project
Las Vegas, NV
Bid Date: Feb 24 2026
Las Vegas, NV
Bid Date: Mar 09 2026
Las Vegas, NV
Bid Date: Feb 12 2026
Las Vegas, NV
Bid Date: Feb 13 2026
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Mar 13 2026
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Mar 03 2026
Las Vegas, NV
Bid Date: Mar 17 2026
Las Vegas, NV
Bid Date: Feb 18 2026
Las Vegas, NV
Bid Date: Feb 19 2026
Las Vegas, NV
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.