BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work and renovation of a civil project in Las Vegas, Nevada. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

This Project will perform a condition assessment of four (4) parallel existing water lines at the Flamingo Water Resource Center (FWRC). The water lines run from the furnace and chiller located in the Secondaries 1-8 Blower Building (Blower Bldg) to the Operational Control Center (OCC). The total length of each water line is approximately 750 feet; around 250 feet of this total length is buried pipe that runs from the OCC to the Utility Tunnel, and the remaining 500 feet runs through the Utility Tunnel to the Blower Bldg. Based on the assessment, the lines will be replaced or rehabilitated as necessary. The limits of replacement may be 250 feet of buried pipes (4 lines in a trench with 12" separation) from the OCC to the Utility Tunnel, or the entire 750 feet of pipes between the OCC and the Blower Bldg. The project is included in the County's 2026-2030 Capital Improvement Program (CIP). As of February 11, 2026, the project is in pre-design. The project is expected to bid publicly to contractors in March of 2026. Construction is expected to begin in July of 2026 and be completed by August of 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com

Conceptual

Water / Sewer

$1,000,000.00

Public - County

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

Project location map

5857 E Flamingo Rd, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.