Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 23, 2026 at 8:00 PM
Updated March 24, 2026
Renovation of a detention facility in Normal, Illinois. Completed plans call for the renovation of a detention facility.
The purpose of this project is to replace the remaining pneumatic HVAC controls with digital controls. Question Deadline 02/18/2026 at 4:00 PM CT RFP Process Questions Mr. Anthony Grant, McLean County Assistant Administrator Telephone: (309) 888-5110 e-mail: Anthony.Grant@mcleancountyil.gov. Content and Technical Specifications Mr. Scott Fogler, McLean County Facilities Department Project Manager Telephone: (309) 641-3125 e-mail: Scott.Fogler@mcleancountyil.gov o The contractor shall provide all work necessary for a complete and operational system. o Tools, ladders, or other materials must be behind locked doors if left unattended. o Coordinate all work schedules with facility staff to avoid resident movement conflicts or disruption of daily operations. o Project planning by contractor to maintain continuous HVAC service to occupied areas o Functional performance testing of all equipment installed o Verification of control sequences o Alarm testing and BAS integration verification o Replace the remaining existing obsolete and filing pneumatic control system with a Distech Controls Building Automation System that fully integrates directly with existing Niagara N4 software and provides the latest hardware and technology. o Systems: o Furnish and install new BAS controllers to provide full control of each system o Provide programming to operate all connected devices o Provide graphics for each new controller on the existing Supervisor server o Run a new Ethernet network (CAT5e or better) to each new controller. Home runs will be made back to nearest IT switch, as directed by owner's IT department. Each run will include a spare cable from point to point o Re-use existing power circuits o Replace sensors and other field devices as required o Demo Pneumatic Devices o Demo Pneumatic lines back to main junctions and cap o Furnish and install a new UPS for each BAS enclosure o Provide on-site training for McLean County Maintenance Staff o Perform the work listed above and additional work below for the following units, where required to replace pneumatics: Exhaust Fans 1 through 5, 7 through 10 and 12. 1. Furnish and install damper actuators 2. Furnish and install controls to tie into the existing system Unit Heaters 1 through 5 1. Furnish and install control valve 2. Furnish and install enable relay and room sensor Cabinet Unit Heaters 1 through 7 1. Furnish and install control valve 2. Furnish and install enable relay and room sensor Finned Tube Radiation 1 (qty 3) 1. Furnish and install control valve 2. Furnish and install room sensor Convectors 1 through 7 1. Furnish and install control valve 2. Furnish and install room sensor Questions may be asked during after this pre-submission conference, and all written questions will need to be submitted no later than Wednesday, February 18th, 2026 @ 4pm (CST).
Award
Jails / Prisons
$1,610,400.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
March 27, 2026
903 N Main St, Normal, IL
Related To This Project
Normal, IL
Bid Date: Mar 31 2026
Normal, IL
Bid Date: Mar 25 2026
Normal, IL
Bid Date: Feb 27 2026
Normal, IL
Bid Date: Feb 19 2026
Normal, IL
Bid Date: Feb 19 2026
Normal, IL
Bid Date: Jan 28 2026
Normal, IL
Bid Date: Feb 25 2026
Normal, IL
Bid Date: Dec 18 2025
Normal, IL
Bid Date: Dec 11 2025
Normal, IL
Bid Date: Dec 18 2025
Normal, IL
Bid Date: Dec 19 2025
Normal, IL
--
Normal, IL
--
Normal, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
