Site work for a transportation facility in Cleveland, Ohio. Completed plans call for site work for a transportation facility.
The existing communications cabinet has deteriorated and reached the end of its useful life. This project will replace the existing cabinet and install heating and air conditioning for the cabinet. All questions should be put in writing to Lou Catalusci at: Fax: 216-350-5297 or via e-mail: lcatalusci@gcrta.org. The last day for questions is Friday, February 13, 2026. Substantial Completion is 270 Days after Notice to Proceed. Final Completion is 330 days after Notice to Proceed. There are liquidated damages for failure to meet the substantial and final completion milestones, $350.00 per day for failure to meet substantial completion and $250.00 per day for failure to meet final completion. There is no DBE goal for this project. The existing communications cabinet has deteriorated and reached the end of its useful life. This project will replace the existing cabinet and install heating and air conditioning for the cabinet. . The signal work shall in general include all equipment, labor, reinstallation, and testing to provide/maintain GCRTA's signal system during and after the track construction. The contractor shall assure and maintain continuity of signal service during the duration of the contract. C. The contractor shall comply generally with the following criteria for storage, reuse, modification, relocation, and reinstallation of existing facilities: 1. Removal and reinstallation of wayside signaling equipment. 2. All underground local cables shall be reused. If any cable is damaged during the work process, replace with new cable and test as specified. 3. Removal and reinstallation of all track cables and bootlegs, impedance bonds and their JB's, and signal cables to facilitate the track work. Reinstall all wires and cables at required depths. 4. Provide a final coat of paint and stenciling to all relocated field equipment, including junction boxes, and impedance bond covers. 5. Location, installation and testing of insulated joints. 6. The wire shall be connected to the rails by means of a standard CAD weld Communication regarding this procurement, including requests for clarification shall be directed in writing to Lou Catalusci, Contract Administrator II; e-mail: lcatalusci@gcrta.org
Award
Transportation Terminals
$70,338.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.