BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a transportation facility in Cleveland, Ohio. Completed plans call for site work for a transportation facility.

The existing communications cabinet has deteriorated and reached the end of its useful life. This project will replace the existing cabinet and install heating and air conditioning for the cabinet. All questions should be put in writing to Lou Catalusci at: Fax: 216-350-5297 or via e-mail: lcatalusci@gcrta.org. The last day for questions is Friday, February 13, 2026. Substantial Completion is 270 Days after Notice to Proceed. Final Completion is 330 days after Notice to Proceed. There are liquidated damages for failure to meet the substantial and final completion milestones, $350.00 per day for failure to meet substantial completion and $250.00 per day for failure to meet final completion. There is no DBE goal for this project. The existing communications cabinet has deteriorated and reached the end of its useful life. This project will replace the existing cabinet and install heating and air conditioning for the cabinet. . The signal work shall in general include all equipment, labor, reinstallation, and testing to provide/maintain GCRTA's signal system during and after the track construction. The contractor shall assure and maintain continuity of signal service during the duration of the contract. C. The contractor shall comply generally with the following criteria for storage, reuse, modification, relocation, and reinstallation of existing facilities: 1. Removal and reinstallation of wayside signaling equipment. 2. All underground local cables shall be reused. If any cable is damaged during the work process, replace with new cable and test as specified. 3. Removal and reinstallation of all track cables and bootlegs, impedance bonds and their JB's, and signal cables to facilitate the track work. Reinstall all wires and cables at required depths. 4. Provide a final coat of paint and stenciling to all relocated field equipment, including junction boxes, and impedance bond covers. 5. Location, installation and testing of insulated joints. 6. The wire shall be connected to the rails by means of a standard CAD weld Communication regarding this procurement, including requests for clarification shall be directed in writing to Lou Catalusci, Contract Administrator II; e-mail: lcatalusci@gcrta.org

Award

Transportation Terminals

$70,338.00

Public - City

Site Work

8

17

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

March 25, 2026

Project location map

1240 W 6th St, Cleveland, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.