BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Rantoul, Illinois. Completed plans call for site work for a water / sewer project.

Wastewater treatment facility improvements include replacing one existing traveling bridge sand filter with a cloth media filter; improvements to digester gas handling including new heat exchanger, updated HVAC equipment in the space and updated gas safety equipment; replacement of existing storm screw pump; replacement of existing primary sludge withdrawal valves; and general building improvements. General construction of these structures and new treatment processes includes sitework, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical and instrumentation and control. Bid Security in the amount of not less than 5% of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to the Contract Price. No Bid shall be withdrawn for a period of 120 days after the scheduled opening of the bids without the consent of Owner. The Owner reserves the right to reject any and all Bids, waive informalities in bidding, or to accept the Bid or Bids, which best serves the interests of the Owner. Prospective bidders shall be required to comply with the most recently publicized "Wage of Employees on Public Works (Prevailing Wage) Act." Wages and rates are subject to the provisions of the Davis-Bacon Act. The project is being funded in part by the Illinois EPA's Water Pollution Control Loan Program (WPCLP), and prospective bidders shall comply with all provisions of the rules for that program. This project is being funded by the Clean Water State Revolving Fund and is subject to the Build America, Buy America Act (BABA) requirements. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Water Pollution Control Loan Program, the Davis-Bacon Act, the Employment of Illinois Workers on Public Works Act, IL Works Jobs Program Act Apprenticeship Initiative, and the Build America, Buy America Act requirements. This procurement is also subject to the loan recipient's policy regarding the increased use of Disadvantaged Business Enterprises, which requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. Question Deadline 03/12/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening for Bids may not be answered.

Award

Water / Sewer

$8,103,385.00

Public - City

Site Work

130

30

38

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
106
Bidding Soon
1,125
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

May 18, 2026

Project location map

Multiple Locations, Rantoul, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.