BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Site work for a water / sewer project in Fresno, California. Completed plans call for site work for a water / sewer project.

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. The Contract Documents consist of the Contract, the Notice Inviting Bids, Instructions to Bidders, Bid Proposal (including documentation accompanying the Bid Proposal and any post-Bid Proposal documentation submitted before the Notice of Award), the Bonds, permits from regulatory agencies with jurisdiction, General Provisions, Special Provisions, Plans, Standard Plans, Standard Specifications, Reference Specifications, Addenda, Change Orders, and Supplemental Agreements. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of work to be performed may vary at the discretion of the City Engineer. Time for completion of the Work is Thirty (30) total Working Days from the date specified in the Notice to Proceed and shall be inclusive of the procurement time to furnish and install all materials associated with this project. Project Type Bid Response Types Type of Award Lump Sum Line Items License Requirements Each Bidder shall possess either a valid Class "A" Contractor's license or valid Class "C-8" specialty license issued by the California State Contractors License Board. The successful Contractor must also possess a current City Business license. Liquidated Damages $1000/day The scope of work includes site security improvements at Pump Station 58A, located at 3125 E. Simpson Avenue. Work is to include the removal of 2 existing swing gates and associated hardware, supply and installation of approximately 154 LF of new 3'6" tall Concrete Masonry Units (CMU) wall toppers to existing CMU wall per drawings and details, supply and installation of approximately 185 LF of new 2'10" tall CMU wall toppers to existing CMU wall per drawings and details and supply and installation of 2 new 19 LF rolling gates and associated hardware. Hardware is to include a multi-lock system to be submitted by the contractor and approved by the engineer. Any questions concerning this bid should be referred to the designated Procurement Specialist, Sean Miranda at Purchasing@fresno.gov, and may be submitted electronically by utilizing the Questions and Answers field or by contacting the City of Fresno Purchasing Division, at (559) 621-1332 before 28th Feb 2026

Bid Results

Water / Sewer

$108,484.00

Public - City

Site Work

8

3

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
3
Bidding Soon
407
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 2, 2026

Project location map

3125 E Simpson Ave, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.