BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work and renovation of a civil project in Brunswick, Georgia. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Description Brunswick-Glynn Joint Water and Sewer Commission (hereinafter referred to as Owner) is soliciting proposals from qualified Progressive Design-Build (PDB) teams for the rehabilitation or replacement of three (3) complete electrical systems at JWSC Water Production Facilities and construction, installation, and programming of nineteen (19) previously designed SCADA remote terminal units (RTUs) at Water Production Facilities and Elevated Storage Tanks throughout Glynn County. This RFP invites interested Proposers to submit their Qualifications and Cost Proposals to perform the work contemplated for the Project. Proposals shall be prepared according to the requirements set forth in this RFP, including the format and content guidelines in Section 5. The Proposals will be reviewed and evaluated using the selection process described in Section 6. The capitalized terms in this RFP have the meanings as first used in the text of this RFP or as defined in Attachment A (Definition of Terms). The Project is to be designed and constructed in two phases using the progressive Design/Build delivery method: Phase One: Preliminary Services: Design development, evaluation of alternatives, cost modeling, constructability review, permitting assistance, risk assessment, and development of a Guaranteed Maximum Price (GMP) cost proposal for completion of Phase Two. Phase Two: Final Design and Construction: Completion of design documents, procurement of equipment and materials, construction, commissioning, and closeout. The Phase 1 services will be performed under an initial contract. Upon successful negotiation of a GMP, the Owner may execute an amendment for Phase 2 services.Deadlines for Questions: First Deadline (prior to Pre-proposal Meeting and Site Visit): Friday, February 21, 2026, 12:00 NOON EST Final Deadline: Tuesday, March 3, 2026, 12.:00 NOON EST Questions regarding this solicitation shall be made in writing to the Purchasing Director, Pam Crosby, via email: pcrosby@bgjwsc.org no later than 12:00 NOON EST on Tuesday, March 3, 2026, at 12:00 NOON. Mandatory Pre-Proposal Meeting and Site Visit 161 S Harrington Road, SSI, GA 31522 Tuesday, February 24, 2026 - 10:00 a.m. EST The order and timeframe of the site visits will be as follows: Time Location Address 10:00 a.m. - 10:30 a.m. Harrington WPF 161 S Harrington Road, SSI 10:45 a.m. - 11:15 a.m. Airport WPF 1964 Demere Road, SSI 11:30 a.m. - NOON Mallery WPF 950 Mallery Street, SSI Shortlist Confirmed

Final Planning

Water / Sewer

$2,600,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
1
Bidding Soon
527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

June 1, 2026

Project location map

Multiple Locations, Brunswick, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.