BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Renovation of an educational facility in Schreiber, Ontario. Completed plans call for the renovation of a primary / secondary education facility.

3-Stop Lift Modernization at Holy Angels Separate School. A summary of Work highlights includes, but is not limited to: 1. Remove existing hoistway doors, frames and interlocks at all levels (3 levels). 2. Remove approximately 6” of block to enlarge openings for new doors. Typical all 3 levels. 3. Remove existing corridor door and frame. Typical (2) doors. 4. Disconnect and lock out all power, controls, and fire alarm wiring to existing lift equipment. 5. Remove lift cab, guide rails and all hoistway equipment. Remove all lift machine room equipment (motor, controller, governor, disconnects, etc.) 6. Drain and remove hydraulic pump tank, piping, and fluids. 7. Provide new motor & equipment 30 amp disconnect fused 15A c/w auxiliary contacts. 208VAC 3PH 60hz 3p4W fused disconnect fed from Panel A. 8. Provide new 120 VAC 1PH 60HZ 1P3W 30 amp disconnect fused 15A lift lighting fed from panel A. 9. Supply and install new opening surround caps at new openings. Typical (2) openings. 10. Patch/finish & make good all masonry work around new doors. Typical (3) doors. 11. Provide new 3 stop Garaventa Elvoron CPR vertical lift platform, finishes, lighting, and operating panels. 12. Install new hoist machine, controller, pump, and related equipment in machine room. 13. Install new guide rails and safety devices in hoistway. 14. Run new dedicated phone line to machine room. 15. Install new hoistway doors frames, and interlocks at all floors. 16. Test, adjust, and commission elevator system. Provide final inspection and certifications with TSSA authority prior to use. Deadline for Questions: February 20th, 2026, 5:00 pm (EST) Direct questions are to be provided in written form only to: ABLE Energy Management & Design e-mail: alex@ableenergy.ca cc: weston@ableenergy.ca

Sub-Bidding

Educational

$200,000.00

Public - State/Provincial

Renovation

4

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
5
Bidding Soon
21
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

June 26, 2026

Project location map

210 Winnipeg St, Schreiber, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.