BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Oak Park, Michigan. Completed plans call for the renovation of a 33,398-square-foot educational facility.

Sealed bid proposals are invited for "Asbestos Abatement at Einstein Elementary School and Pepper Elementary School." Bidding documents are available from Nova Environmental, Inc. after February 16, 2026, and at a mandatory pre-bid examination. Bidders must attend a mandatory pre-bid examination of the buildings at 9:00 a.m. on February 16, 2026, starting at Einstein Elementary School. Bid security in the form of a Bid Bond from a T-listed bonding company, Cashier’s Check, or Certified Check for 5% of the bid amount must be submitted. Performance and Labor and Material Bonds are required upon award. Familial and Iranian Disclosure Statements must be submitted with the bid proposal. Bids must remain firm for acceptance for 60 days. The owner reserves the right to accept or reject any or all bids. BID #1: Einstein Elementary School Abatement Activities This section defines the asbestos abatement activities that the awarded Contractor will perform in each noted Functional Space (FS) at Einstein Elementary School. PHASE 1 -Flooring 1. Remove all ACM floor tile (FT), non-ACM floor tile mastic (M), and non-ACM carpet (C) approximately 17,374 sq. ft of FT/M and 16,024 sq. ft. of C from the following areas: AREA APPROXIMATE QUANTITY 130-135 Hallway (FS# 23) 1,020 sq. ft. C/FT/M 120-125 Hallway (FS# 47) 850 sq. ft. C/FT/M 150-155 Hallway (FS# 71) 1,000 sq. ft. C/FT/M Room 141 (FS# 108) 1,364 sq. ft. C/FT/M 140-145 Hallway (FS# 116) 1,000 sq. ft. C/FT/M 110-115 Hallway (FS# 155) 1,020 sq. ft. C/FT/M Main Office (FS# 167) 350 sq. ft. C/FT/M Cafeteria (FS# 197) 1,350 sq. ft. FT/M Northwest Hallway (FS# 190) 1,060 sq. ft. C/FT/M Northeast Hallway (FS# 191) 1,060 sq. ft. C/FT/M North Central Hallway and Vestibules (FS# 192) 1,120 sq. ft. C/FT/M East Hallway and Vestibule (FS# 193) 2,060 sq. ft. C/FT/M West Hallway and Vestibule (FS# 194) 2,060 sq. ft. C/FT/M Far West Hallway and Vestibule (FS# 195) 2,260 sq. ft. C/FT/M Location EINSTEIN ELEMENTARY SCHOOL 14001 NORTHEND OAK PARK, MICHIGAN 48237 & PEPPER ELEMENTARY SCHOOL 24301 CHURCH STREET OAK PARK, MICHIGAN 48237 Questions may be addressed to: Nova Environmental, Inc. Andrew Kokoszka, (734) 930-0995 akokoszka@nova-env.com Oak Park Schools Tiffany Cavill, Director of Operations

Award

Educational

$2,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
266
Bidding Soon
3,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

June 15, 2026

Project location map

Multiple Locations, Oak Park, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.