Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Site work for a sidewalk / parking lot in Wilsonville, Oregon. Completed plans call for site work for a sidewalk / parking lot.
The work consists of furnishing all materials, labor, equipment, and supervision for reconstructing the New Life Church Parking Lot. Improvements include approximately 710 square yards of removal of surfacing, 290 cubic yards of general excavation, 710 feet of crack sealing, 890 square yards of slurry sealing, 210 tons of asphalt concrete pavement installation, 290 cubic yards of aggregate base installation, and 2 curb ramp reconstructions. Additional and incidental work as specified in the Specifications and Contract Documents is also required. The estimated cost range is $275,000 - $300,000. All bids must be submitted on forms provided in the Project Specifications and Contract Documents and accompanied by a Bid Security in the amount of ten percent of the total bid. The successful Bidder must furnish Performance and Payment Bonds from a City-approved surety for the full contract price. Bidders must be qualified by the City of Wilsonville in compliance with applicable state statutes and pre-qualified by the Oregon Department of Transportation in the "ACP" Class of Work before the bid due date. Bidders must comply with state prevailing wage rates, all tax laws, and maintain required licenses and bonds. Examination of the site and Specifications prior to bid submission is required. The City reserves the right to reject any bid not in compliance with public contracting procedures and requirements, or all bids if in the public interest. Question Deadline 02/25/2026 at 5:00 PM PTcontact the City Project Manager: Marissa Rauthause, PE City of Wilsonville 29799 SW Town Center Loop E. Wilsonville OR 97070 , Telephone: (503) 570-1538 Email: mrauthause@wilsonvilleoregon.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Sidewalks / Parking Lot
$229,229.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2026
April 10, 2026
27960 SW Canyon Creek Rd, Wilsonville, OR
Related To This Project
Wilsonville, OR
Bid Date: Mar 31 2026
Wilsonville, OR
Bid Date: Mar 31 2026
Wilsonville, OR
Bid Date: Apr 09 2026
Wilsonville, OR
Bid Date: Apr 09 2026
Wilsonville, OR
Bid Date: Apr 15 2026
RFP - Owners’ Representative For Water Treatment Plant Operations And Maintenance Contract - 6097906
Wilsonville, OR
Bid Date: Apr 29 2026
Wilsonville, OR
Bid Date: Apr 28 2026
Wilsonville, OR
Bid Date: May 06 2026
Wilsonville, OR
Bid Date: Mar 11 2026
Wilsonville, OR
Bid Date: Mar 03 2026
Wilsonville, OR
Bid Date: Feb 05 2026
Wilsonville, OR
Bid Date: Feb 11 2026
Wilsonville, OR
Bid Date: Feb 11 2026
Wilsonville, OR
Bid Date: Jan 29 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.