BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Bellwood, Illinois. Completed plans call for site work for a water / sewer project.

The project consists of replacing the existing 6-inch diameter water main located on Marshall Avenue from St. Charles Road to Butterfield Road by installing 8-inch ductile iron pipe and fittings. The project includes installation of new valves, valve vaults, and fire hydrant assemblies, as well as replacing existing lead service lines with copper water service lines. Approximately 1,100 linear feet of eight-inch ductile iron water main will be installed, with new valves, valve vaults, and water service connections to feed residences. Restoration of immediate pavement areas, intermittent curb and gutter replacement, concrete sidewalks, driveways, and landscape restoration are also part of the work. Bidders must submit proposals on provided forms. All bids must be accompanied by a bid bond, certified or cashier's check in an amount not less than ten percent (10%) of the total proposal, as a guarantee of entering into a contract if accepted. Bidders must be prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work. The successful bidder must file a performance bond equal to 100% of the bid. Contractors and subcontractors are required to pay prevailing wages as per the Davis-Bacon Act and comply with associated federal laws, including labor standards and affirmative action requirements. Bidders are required to provide sufficient insurance or indemnity to cover claims for damages to persons or property due to negligence during construction. The Village of Bellwood reserves the right to determine the lowest, responsive, responsible bidder, waive irregularities, and reject any or all proposals.

Bid Results

Water / Sewer

$1,107,854.00

Public - City

Site Work

15

6

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
335
Bidding Soon
4,444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 10, 2026

Project location map

Marshall Avenue from St Charles Road to Butterfield Road, Bellwood, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.