Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 8, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Bellwood, Illinois. Completed plans call for site work for a water / sewer project.
The project consists of replacing the existing 6-inch diameter water main located on Marshall Avenue from St. Charles Road to Butterfield Road by installing 8-inch ductile iron pipe and fittings. The project includes installation of new valves, valve vaults, and fire hydrant assemblies, as well as replacing existing lead service lines with copper water service lines. Approximately 1,100 linear feet of eight-inch ductile iron water main will be installed, with new valves, valve vaults, and water service connections to feed residences. Restoration of immediate pavement areas, intermittent curb and gutter replacement, concrete sidewalks, driveways, and landscape restoration are also part of the work. Bidders must submit proposals on provided forms. All bids must be accompanied by a bid bond, certified or cashier's check in an amount not less than ten percent (10%) of the total proposal, as a guarantee of entering into a contract if accepted. Bidders must be prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work. The successful bidder must file a performance bond equal to 100% of the bid. Contractors and subcontractors are required to pay prevailing wages as per the Davis-Bacon Act and comply with associated federal laws, including labor standards and affirmative action requirements. Bidders are required to provide sufficient insurance or indemnity to cover claims for damages to persons or property due to negligence during construction. The Village of Bellwood reserves the right to determine the lowest, responsive, responsible bidder, waive irregularities, and reject any or all proposals.
Bid Results
Water / Sewer
$1,107,854.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
April 10, 2026
Marshall Avenue from St Charles Road to Butterfield Road, Bellwood, IL
Related To This Project
Bellwood, IL
Bid Date: Mar 24 2026
Bellwood, IL
Bid Date: Apr 01 2026
Bellwood, IL
Bid Date: Apr 06 2026
Bellwood, IL
Bid Date: Apr 14 2026
Bellwood, IL
Bid Date: Jun 12 2026
Bellwood, IL
Bid Date: Jun 08 2026
Bellwood, IL
Bid Date: Jun 08 2026
Bellwood, IL
Bid Date: Mar 24 2026
Bellwood, IL
Bid Date: Feb 03 2026
Bellwood, IL
Bid Date: Sep 15 2025
Bellwood, IL
Bid Date: Jul 08 2025
Bellwood, IL
Bid Date: Jul 01 2025
Bellwood, IL
Bid Date: Jun 02 2025
Bellwood, IL
Bid Date: May 07 2025
Bellwood, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
