BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a bridge / tunnel in New Waverly, Texas. Completed plans call for site work for a bridge / tunnel.

The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, and supervision necessary to complete the project and shall verify all required material quantities. Contractors are encouraged to visit the project site prior to proposal submission, and there are no utilities available at the site. All work shall be performed in accordance with project documents, plans, and FP-14 requirements, and all trash, debris, and refuse not incorporated into the work shall be removed daily. The magnitude of construction is estimated between $500,000 and $1,000,000 in accordance with FAR 36.204; this range is provided solely to assist offerors in determining capability and does not represent the Government's independent estimate. Offerors are strongly encouraged to visit the project site and are responsible for assessing all local conditions that may affect cost or performance, including access, terrain, and weather. The contractor shall complete all required work within 365 calendar days after receipt of the Notice to Proceed and shall submit a proposed schedule within 10 calendar days of the Notice to Proceed. Performance and payment bonds in the amount of 100 percent of the contract price shall be submitted within 10 calendar days of award in accordance with FAR 52.228-15. FAR 52.236-2, Differing Site Conditions, applies, and contractors must promptly notify the Contracting Officer in writing upon encountering subsurface or latent conditions that differ materially from those indicated or ordinarily encountered. Questions regarding the solicitation are due April 2, 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
156
Bidding Soon
2,631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2026

June 8, 2026

Project location map

To Be Determined, New Waverly, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.