Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a bridge / tunnel in New Waverly, Texas. Completed plans call for site work for a bridge / tunnel.
The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, and supervision necessary to complete the project and shall verify all required material quantities. Contractors are encouraged to visit the project site prior to proposal submission, and there are no utilities available at the site. All work shall be performed in accordance with project documents, plans, and FP-14 requirements, and all trash, debris, and refuse not incorporated into the work shall be removed daily. The magnitude of construction is estimated between $500,000 and $1,000,000 in accordance with FAR 36.204; this range is provided solely to assist offerors in determining capability and does not represent the Government's independent estimate. Offerors are strongly encouraged to visit the project site and are responsible for assessing all local conditions that may affect cost or performance, including access, terrain, and weather. The contractor shall complete all required work within 365 calendar days after receipt of the Notice to Proceed and shall submit a proposed schedule within 10 calendar days of the Notice to Proceed. Performance and payment bonds in the amount of 100 percent of the contract price shall be submitted within 10 calendar days of award in accordance with FAR 52.228-15. FAR 52.236-2, Differing Site Conditions, applies, and contractors must promptly notify the Contracting Officer in writing upon encountering subsurface or latent conditions that differ materially from those indicated or ordinarily encountered. Questions regarding the solicitation are due April 2, 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 8, 2026
To Be Determined, New Waverly, TX
Related To This Project
New Waverly, TX
Bid Date: May 29 2026
New Waverly, TX
Bid Date: Mar 25 2026
New Waverly, TX
--
New Waverly, TX
Bid Date: Jun 10 2025
New Waverly, TX
Bid Date: Jun 10 2025
New Waverly, TX
--
New Waverly, TX
Bid Date: Sep 18 2025
New Waverly, TX
Bid Date: Feb 25 2025
New Waverly, TX
Bid Date: Feb 13 2025
New Waverly, TX
Bid Date: Dec 16 2024
New Waverly, TX
Bid Date: Dec 18 2024
New Waverly, TX
--
New Waverly, TX
Bid Date: Jan 24 2018
New Waverly, TX
Bid Date: Aug 14 2025
New Waverly, TX
Bid Date: Sep 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
