BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Renovation of an educational facility in Columbia, Missouri. Completed plans call for the renovation of a educational facility.

This project shall have a participation goal for Service-Disabled Veteran Business Enterprises (SDVE) of 3% of the total contract value. Contract award: April 2026 Pre-Proposal Meeting with shortlisted firms: March 16, 2026 The anticipated GMP is $57,000,000 with an anticipated substantial completion of Summer 2029. The project is comprised of two efforts consisting of building envelope improvements and utility infrastructure improvements for the facilities. The envelope replacement of the KSMB will include complete removal of existing metal clad envelope at the tower (Levels 2-5 and Penthouses) and replacement with insulated metal panels, complete replacement of existing windows within metal clad envelope at the tower, replacement of windows on the 2nd floor NIC Wing, adding curtainwall windows at select locations at the towers, replacement of selected roofs, exterior LED lighting, firestopping between all floors, refinishing 2nd floor spaces and associated MEP/FP systems to original condition, providing sun screen units at windows, tuck pointing and cleaning of masonry stair towers. Phasing will be designed to react to the current operations at KSMB and KSHP. The infrastructure work at KSMB will be a comprehensive replacement of the building automation system, replacement of domestic pumps, repairs, correction and re-routing of the sanitary lines along with work on the chilled water system. The work will also include an upgrade to the fire alarm and fire protection systems which includes the fire pump and finally a mechanical upgrade to selected air handling units. The infrastructure work for KSHP will include an upgraded fire alarm system, piping mains and heating water lines along with work on the passenger and freight elevators.

Post-Bid

Educational

$57,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2026

October 26, 2026

Project location map

Multiple Locations, Columbia, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.