Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Center Township, Pennsylvania. Completed plans call for site work for a water / sewer project; and water / sewer project.
CONTRACT NO. 26-S2 (CONTRACT A) NEW COLLEGE AND LOWER MOON RUN INTERCEPTOR UPGRADE: The project includes the replacement and relocation of approximately 225 linear feet of 30" SRJ P401 ductile iron sanitary sewer interceptor, manhole relocation, replacement and abandonment, replacement and relocation of 10" SRJ P401 forcemain, forcemain bypass and air-release valve vault, influent sewer vault, select demolition of the New College Lift Station, connection to existing facilities, cleaning and closed circuit televising (CCTV), bypass pumping, and necessary restoration for a complete job basis. CONTRACT NO. 26-S3 (CONTRACT B) NEW COLLEGE AND LOWER MOON RUN INTERCEPTOR UPGRADE: The project includes the open-cut in-trench replacement of approximately 1,400 linear feet of 30" SRJ P401 ductile iron sanitary sewer interceptor, interceptor cast-in-place concrete encasement, manhole relocation, replacement and abandonment, installation of manhole vault with orifice plate, select manhole lining, cleaning and CCTV, connection to existing facilities, and all required restoration. Work includes the furnishing of all labor, superintendence, materials, tools and equipment and performing all necessary work to complete all General Construction in accordance with the Contract Documents. All bidders must purchase Bid Documents in PDF format for a non-refundable fee. Proposals must be on specified forms and accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid. Compliance with applicable federal, state, and municipal requirements, including the Pennsylvania Prevailing Wage Act, Steel Products Procurement Act, and Public Works Employment Verification Act, is required. Contractors must demonstrate solicitation of Disadvantaged Business Enterprises (DBEs) and compliance with Good Faith Efforts. The Center Township Sanitary Authority reserves the right to reject any or all proposals and to waive any informalities in the bidding. No bid may be withdrawn for ninety (90) calendar days after the scheduled time for receipt of bids.
Bid Results
Water / Sewer
$2,410,850.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
May 4, 2026
To be determined, Center Township, PA
Related To This Project
Center Township, PA
Bid Date: Mar 24 2026
Center Township, PA
Bid Date: Apr 20 2026
Center Township, PA
Bid Date: Mar 31 2026
Center Township, PA
Bid Date: Apr 20 2026
Center Township, PA
Bid Date: Apr 20 2026
Center Township, PA
--
Center Township, PA
Bid Date: Oct 01 2025
Center Township, PA
Bid Date: Jun 13 2025
Center Township, PA
Bid Date: Jun 13 2025
Center Township, PA
--
Center Township, PA
Bid Date: Jul 11 2024
Center Township, PA
Bid Date: Apr 18 2024
Center Township, PA
Bid Date: Feb 08 2022
Center Township, PA
Bid Date: Feb 03 2023
Center Township, PA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
